Delay Optimization in a Multiple AGV Syst

نویسندگان

  • Hamed Fazlollahtabar
  • Mohammad Saidi-Mehrabad
چکیده

The objective of this paper is to propose a scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system. Considering the due date of AGVs requiring for material handling among shops in a job shop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Earliness results in AGVs waiting and tardiness causes temporary part storages in the shop floor. Therefore, we design an innovative stream to minimize the penalized earliness and tardiness.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Mathematical Model for Multiple-Load AGVs in Tandem Layout

Reducing cost of material handling has been a big challenge for companies. Flexible manufacturing system employed automated guided vehicles (AGV) to maintain efficiency and flexibility. This paper presents a new non-linear mathematical programming model to group n machines into N loops, to make an efficient configuration for AGV system in Tandem layout. The model minimizes bot...

متن کامل

Monte Carlo Simulation to Compare Markovian and Neural Network Models for Reliability Assessment in Multiple AGV Manufacturing System

We compare two approaches for a Markovian model in flexible manufacturing systems (FMSs) using Monte Carlo simulation. The model which is a development of Fazlollahtabar and Saidi-Mehrabad (2013), considers two features of automated flexible manufacturing systems equipped with automated guided vehicle (AGV) namely, the reliability of machines and the reliability of AGVs in a multiple AGV jobsho...

متن کامل

Delay Optimization in a Multiple AGV System

The objective of this paper is to propose a scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system. Considering the due date of AGVs requiring for material handling among shops in a job shop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Earliness results in AGVs waiting and tardine...

متن کامل

Bandwidth and Delay Optimization by Integrating of Software Trust Estimator with Multi-User Cloud Resource Competence

Trust Establishment is one of the significant resources to enhance the scalability and reliability of resources in the cloud environment. To establish a novel trust model on SaaS (Software as a Service) cloud resources and to optimize the resource utilization of multiple user requests, an integrated software trust estimator with multi-user resource competence (IST-MRC) optimization mechanism is...

متن کامل

Scheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow

This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014