Comparisons of Oil Production Predicting Models
نویسندگان
چکیده
Feasibility of oil production predicting results influences the annual planning and long-term field development plan of oil field, so the selection of predicting models plays a core role. In this paper, three different predicting models are introduced, they are neural network model, support vector machine model and GM (1, 1) model. By using these three different models to predict the oil production in XINJIANG oilfield in China, advantages and disadvantages of these models have been discussed. The predicting results show: the fitting accuracy by the neural network model or by the support vector machine model is higher than GM (1, 1) model, the prediction error is smaller than 10%, so neural network model and support vector machine model can be used to short-term forecast of oil production; predicting accuracy by GM (1, 1) model is not good, but the curve trend with GM (1, 1) model is consistent with the downward trend in oil production, so GM (1, 1) predicting model can be used to long-term prediction of oil production.
منابع مشابه
Use of Operation Research Planning Models to Determine the Optimum Levels of Crude Oil and Gas Production in Iranian Oil and Gas Projects- Case Study: South Pars Project Phases 17 & 18
Determining the optimal level of oil and gas production from the upstream projects of the country is one of the main challenges in the formulation of Master Development Plans (MDP) for petroleum projects and impacts the return on investment and profitability of contracting parties, especially the contractor. In Iran's oil and gas contracts, since the development of the MDP is the responsibility...
متن کاملArtificial neural network models for production of nano-grained structure in AISI 304L stainless steel by predicting thermo-mechanical parameters
An artificial neural network (ANN) model is developed for the analysis, simulation, and prediction of the austenite reversion in the thermo-mechanical treatment of 304L austenitic stainless steel. The results of the ANN model are in good agreement with the experimental data. The model is used to predict an appropriate annealing condition for austenite reversion through the martensite to austeni...
متن کاملبهینه یابی مسیر تولید نفت ایران: یک مدل کنترل بهینه برنامه ریزی پویا
In this article we present a dynamic programming model for oil production in Iran. To this end, we represent our model in the form of a Bellman equation in which the function for discounted profit as the objective function is formulated as a Bellman equation, and hence is viewed as a dynamic programming problem.Specifically, in order to show the liquids flow in oil tanks, we use differential eq...
متن کاملA committee machine approach for predicting permeability from well log data: a case study from a heterogeneous carbonate reservoir, Balal oil Field, Persian Gulf
Permeability prediction problem has been examined using several methods such as empirical formulas, regression analysis and intelligent systems especially neural networks and fuzzy logic. This study proposes an improved and novel model for predicting permeability from conventional well log data. The methodology is integration of empirical formulas, multiple regression and neuro-fuzzy in a commi...
متن کاملA New Method for Predicting Well Pattern Connectivity in a Continental Fluvial-delta Reservoir
The features of bad flow unit continuity and multiple layers emphesize the importance of a well pattern design for the development of a fluvial-delta reservoir. It is proposed a method to predict well pattern connectivity (WPC) based on the exploration and evaluation of wells. Moreover, the method helps evaluate the risk of well placement. This study initially establishes the parameters for cha...
متن کامل