The PCP: A predictive model for satisfying conflicting objectives in scheduling problems
نویسنده
چکیده
It is argued that to achieve the required balance between objectives, a scheduling system must have the ability to relate the consequence of a decision to the satisfaction of overall objectives. The dissertation introduces the concept of a preference capacity plan (PCP) in an attempt to give automated schedulers this ability. PCP takes cognizance of both predicted demand for capacity and the interactions that exist between scheduling objectives. Experimental analysis is used to illustrate the power, versatility, and practicality of the PCP approach Dissertation Abstract
منابع مشابه
Nurse rostering using fuzzy logic: A case study
In this paper, we used the fuzzy set theory for modeling flexible constraints and uncertain data in nurse scheduling problems and proposed a fuzzy linear model for nurse rostering problems. The developed model can produce rosters that satisfy hospital objectives, ward requirements and staff preferences by satisfying their requests as much as possible. Fuzzy sets are used for modeling demands of...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملShort-term Price-based Unit Commitment of Hydrothermal GenCos: A Pre-emptive Goal Programming Approach
The solution of single-objective unit commitment problems for generation companies participating in deregulated markets may not directly be implementable mainly because of neglecting some conflicting secondary objectives arising from policy-making at internal/external environment. Benefiting an efficient multi-objective approach to improve the applicability of price-based unit commitment soluti...
متن کاملThe Finite Horizon Economic Lot Scheduling in Flexible Flow Lines
This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- AI Magazine
دوره 13 شماره
صفحات -
تاریخ انتشار 1992