Production Systems with Rework and Machine Failure Taking Place in Backorder Filling Time
نویسندگان
چکیده
This paper investigates the optimal refilling policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article [Chiu, Y.P., 2003. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 35, 427-437] has studied the lot-sizing problem on an imperfect quality EPQ model. However, another reliability factor random machine breakdown is inevitable in most real-life production systems. To deal with stochastic machine failures, production planners must practically calculate the mean time between failures (MTBF) and establish the robust plan accordingly, in terms of the optimal production run time that minimizes total production-inventory costs for such an unreliable system. This study extends Chiu’s work and assumes that a machine failure takes place in the backorder replenishing stage. Mathematical modeling and cost analysis are employed. The renewal reward theorem is used to cope with variable cycle length. Convexity of the long-run average cost function is proved and an optimal manufacturing lot-size that minimizes the expected overall costs for such an imperfect system is derived. Numerical example is provided to demonstrate its practical usages. Key-Words: Optimization, Lot size, Breakdown, Backorder, Production run time, Rework, Inventory
منابع مشابه
Producer′s Replenishment Policy for an EPQ Model with Rework and Machine Failure Taking Place in Backorder Reloading Time
This paper studies the optimal producer′s replenishment policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article has studied the lot-sizing problem on an imperfect quality EPQ model. However, another reliability factor random machine breakdown is inevitable in most real-life production systems. To de...
متن کاملEconomic Production Quantity Model with Backordering, Rework and Machine Failure Taking Place in Stock Piling Time
This paper investigates the optimal inventory replenishment policy for an economic production quantity (EPQ) model with backordering, rework and machine breakdown taking place in stock piling time. A prior paper by Chiu has examined the lot-sizing problem on an imperfect quality EPQ model. Due to another reliability factor random machine breakdown seems to be inevitable in most real world manuf...
متن کاملOptimal Batch Production for a Single Machine System with Accumulated Defectives and Random Rate of Rework
In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...
متن کاملScheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles
In this paper we consider a single machine system that produces items part of which are defective. The defective items produced in a time period, consisting of several equal cycles, are accumulated and are all reworked in the last cycle of this period called the rework cycle. At the end of the rework cycle the whole process will start all over again. The first significant objective of this stud...
متن کاملOptimal Run Time for EMQ Model with Backordering, Failure-In- Rework and Breakdown Happening in Stock-Piling Time
This study examines the optimal run time for the economic manufacturing quantity (EMQ) model with failure-in-work, backlogging, and random breakdown happening in stock-piling time. A recent article by Chiu and Chiu [Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific & Industrial Research, 65 (2006) 499-506] investigated optimal lot-size for...
متن کامل