Purchasing Accelerator Subsystems as Turnkey Components

نویسنده

  • S. Hunt
چکیده

Many new accelerator projects are purchasing complex components as turn-key systems rather than building them in-house. If not managed efficiently this can cause problems in integrating these components with the global accelerator control system. Having these components delivered with a ’foreign’ control system can cause performance bottlenecks and problems of maintenance. Later replacing these controls is often necessary, but is time consuming and expensive. At SLS we avoided these problems by having the external companies deliver these systems (including Linac and RF) with Epics [1]. To ensure compatibility, we supplied the necessary hardware, and provided the companies with training and support. This ensured a relatively trouble free integration, and contributed to the very fast commissioning of the SLS.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Commissioning of the 100 MeV Swiss Light Source Injector Linac

The 100 MeV injector for the Swiss Light Source, designed and delivered as turnkey system by ACCEL Instruments, was commissioned in April 2000 [1]. A description of the system consisting of electron source, buncher section, accelerating structures, rf power plant and control system will be given. Specified and measured beam parameters will be compared to show the performance of the entire system.

متن کامل

TINE as an accelerator control system at DESY

Large research institutes such as accelerator-based research centres deal with a large number of complicated components, which should be integrated into and controlled as one homogeneous system. The components of such systems have been frequently developed at different times, in different countries and use different standards and technologies. The control system of components or subsystems may ...

متن کامل

Commissioning of the Swiss Light Source

The Swiss Light Source (SLS) at the Paul Scherrer Institute (PSI) consists of a turn key 100 MeV linac, a novel type of booster synchrotron and a 12-TBA storage ring providing 5 nm·rad natural emittance at 2.4 GeV. The SLS project was approved by Swiss Government in Sept. 1997. By June 1999 the building was finished. Linac and booster commissioning concluded by April, resp. Sept. 2000. First be...

متن کامل

Introduction of Modern Subsystems at the Kek Injector-linac

As an accelerator control system survives over several years, it is often the case that new subsystems are introduced into the original control system. The control system for the KEK electron/positron injector-linac has been using Unix workstations and VME computers since 1993. During the eight-year operation, we extended the system by introducing a) Windows PCs, b) PLC controllers with a netwo...

متن کامل

MVS I/O Subsystems: Configuration Management and Performance Analysis

Why should wait for some days to get or receive the mvs i o subsystems configuration management and performance analysis book that you order? Why should you take it if you can get the faster one? You can find the same book that you order right here. This is it the book that you can receive directly after purchasing. This mvs i o subsystems configuration management and performance analysis is we...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002