Toward an effort estimation model for software projects integrating risk
نویسندگان
چکیده
According to a study of The Standish Group International, 44% of software projects cost more and last longer than expected. More accurate the effort estimation is; the better the enterprise gets organized and the more the software project respects the commitments on budget, time and quality. Enhancing the accuracy of effort estimation remains an ongoing challenge to software professionals. Several factors can influence the accuracy of effort estimation, namely the immaterial aspect of information system projects, new technologies and the lack of return on experience. However, the most important factor of cost and delay increase is software risks. A software risk is an uncertain event with a negative consequence on the software project. In this article, we propose a methodology to take into account risk exposure analysis in the effort estimation model. In the literature, this issue is little addressed and few approaches are investigated. In this research work, we first present an overview of these approaches and their limits. Then, we propose an effort estimation model that improves the accuracy of estimation by integrating software risks. We finally apply this model to a case study and compare its results to the results of a classic model.
منابع مشابه
An Improved COCOMO based Model to Estimate the Effort of Software Projects
One of important aspects of software projects is estimating the cost and time required to develop projects. Nowadays, this issue has become one of the key concerns of project managers. Accurate estimation of essential effort to produce and develop software is heavily effective on success or failure of software projects and it is highly regarded as a vital factor. Failure to achieve convincing a...
متن کاملAn Improved Algorithmic Method for Software Development Effort Estimation
Accurate estimating is one of the most important activities in the field of software project management. Different aspects of software projects must be estimated among which time and effort are of significant importance to efficient project planning. Due to complexity of software projects and lack of information at the early stages of project, reliable effort estimation is a challenging issue. ...
متن کاملA Hybrid Intelligent Model to Increase the Accuracy of COCOMO
Nowadays, effort estimation in software projects is turned to one of the key concerns for project managers. In fact, accurately estimating of essential effort to produce and improve a software product is effective in software projects success or fail, which is considered as a vital factor. Lack of access to satisfying accuracy and little flexibility in existing estimation models have attracted ...
متن کاملAn Improved Algorithmic Method for Software Development Effort Estimation
Accurate estimating is one of the most important activities in the field of software project management. Different aspects of software projects must be estimated among which time and effort are of significant importance to efficient project planning. Due to complexity of software projects and lack of information at the early stages of project, reliable effort estimation is a challenging issue. ...
متن کاملA New Empirical Model to Increase the Accuracy of Software Cost Estimation (TECHNICAL NOTE)
We can say a software project is successful when it is delivered on time, within the budget and maintaining the required quality. However, nowadays software cost estimation is a critical issue for the advance software industry. As the modern software’s behaves dynamically so estimation of the effort and cost is significantly difficult. Since last 30 years, more than 20 models are already develo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1509.00602 شماره
صفحات -
تاریخ انتشار 2015