Genetic model selection for a case–control study and a meta-analysis

نویسندگان

  • Nobuyuki Horita
  • Takeshi Kaneko
چکیده

A case-control study often compares the prevalence of a specific disease among persons with normal alleles and persons with variant alleles, which generates an odds ratio (OR). The most common type of allele variation, single-nucleotide polymorphism, consists of a major allele (M) and a minor allele (m). Thus, the genotype can be a major allele homozygote (MM), a heterozygote (Mm) or a minor allele homozygote (mm). Odds are given for each genotype, and a pair of odds generates an OR. Summarizing data using two-by-two contingency is the simplest method of estimating an OR. Thus, dominant, multiplicative, recessive, and over-dominant models are often used. Traditionally, researchers used to calculate ORs using many models and then select the best model from among these calculated ORs. This may cause problems due to multiple comparisons. Therefore, we should choose the best model before calculating the OR for each model. In this article, we will discuss how to choose the best model among many subject-level models when evaluating the impact of the MM/Mm/mm genotype on the disease prevalence.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An optimization technique for vendor selection with quantity discounts using Genetic Algorithm

Vendor selection decisions are complicated by the fact that various conflicting multi-objective factors must be considered in the decision making process. The problem of vendor selection becomes still more compli-cated with the inclusion of incremental discount pricing schedule. Such hard combinatorial problems when solved using meta heuristics produce near optimal solutions. This paper propose...

متن کامل

An Integrated Decision Making Model for Manufacturing Cell Formation and Supplier Selection

Optimization of the complete manufacturing and supply process has become a critical ingredient for gaining a competitive advantage. This article provides a unified mathematical framework for modeling manufacturing cell configuration and raw material supplier selection in a two-level supply chain network. The commonly used manufacturing design parameters along with supplier selection and a subco...

متن کامل

Consolidated Technique of Response Surface Methodology and Data Envelopment Analysis for setting the parameters of meta-heuristic algorithms - Case study: Production Scheduling Problem

    In this study, given the sequence dependent setup times, we attempt using the technique of Response Surface Methodology (RSM) to set the parameters of the genetic algorithm (GA), which is used to optimize the scheduling problem of n job on 1 machine (n/1). It aims at finding the most suitable parameters for increasing the efficiency of the proposed algorithm. At first, a central composite d...

متن کامل

A Bi-Level Meta-heuristic Approach for a Hazardous Waste Management Problem

This study concentrates on designing a medical waste management system with a hierarchical structure, including a local government and a waste management planner. The upper-level seeks to design and control the waste management facilities by minimizing the environmental risks related to the disposal of medical waste. While the lower-level model is to determine the waste collection plans by only...

متن کامل

Sequential and Mixed Genetic Algorithm and Learning Automata (SGALA, MGALA) for Feature Selection in QSAR

Feature selection is of great importance in Quantitative Structure-Activity Relationship (QSAR) analysis. This problem has been solved using some meta-heuristic algorithms such as: GA, PSO, ACO, SA and so on. In this work two novel hybrid meta-heuristic algorithms i.e. Sequential GA and LA (SGALA) and Mixed GA and LA (MGALA), which are based on Genetic algorithm and learning automata for QSAR f...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 5  شماره 

صفحات  -

تاریخ انتشار 2015