Alternate Performance Standard Project - Interpreting the Post - Construction Test
نویسنده
چکیده
In support of a possible performance standard for radon-resistant construction for the State of Florida, a protocol is needed to provide postconstruction indoor radon measurement. In order to relate the results of short term compliance measurements to inferred annual average concentrations, a study was conducted in four regions of Florida known to have potential for elevated indoor radon. Eighty study homes in Polk, Alachua, Dade, and Leon counties are being simultaneously monitored using long term (quarterly and annual alpha track and long term electret-ion chambers) and short term monitors (open-face and barrier charcoal canister and short term electret-ion chambers). Electrets are deployed continuously and read over oneand twoweek intervals. A subset of the houses are monitored using Pylon AB-5 continuous radon monitors. Houses were selected to be representative of typical Florida housing construction, with indoor radon concentration in the 2-20 pCi/L range. Data have been analyzed to isolate systematic seasonal variations and to derive confidence limits for predicted long term (annual) averages from short term measurements according to the candidate protocols. For relevant combinations of device and sampling period, thresholds have been determined below which a single short-term measurement can provide specified confidence that the long-term average radon does not exceed 4 pCi/L. These results have been incorporated into draft building standards.
منابع مشابه
Improvement of project management office performance: An empirical investigation of effective factors in iranian construction industry
Project management office (PMO) is a new emerging concept in Iranian construction industry. Executives expect this organizational unit to add value to the business, and meet the demands of stakeholders by performing specialized tasks ranging from providing project management support to portfolio management. In this regard, PMO managers have long faced the question of how to improve the performa...
متن کاملبررسی اثرات تغییر شاخص های عملکرد ایمنی – اقتصادی بر متوسط روزهای ازدست رفته کاری (مطالعه موردی در پروژه احداث پالایشگاه)*
Background and aims: According to the International Labour Organization, 17% of fatal accidents occur in construction projects and development Workshop. While this number in Iran according to the Labor Department is 46%. In developing Asian countries that are in the process of rapid industrialization occupational accidents is rising. Due to the economic difficulties caused by the sanctions and ...
متن کاملRelationship between Safety Investment and Safety Performance Indices Considering the Project Hazard Level in Construction Industry
Introduction: Each country needs to preserve its human capital through preventing accidents for its development. Therefore, this study is carried out to study the relationship between safety investments and safety performance indices considering the interactive effect of the project hazard level in construction industry. Material and Methods: This study was conducted using multiple case studie...
متن کاملDevelopment and Validation of Active Performance Indicators of Electrical Safety Using Bow-Tie and Bayesian Network Techniques Case Study: Oil and Gas Industries Construction Projects
Background: With the developing use of electricity in all aspects of human life, electricity accidents have also increased. One of the main components of the for the prevention policy, is the safety performance assessment of the organization's or industry's by using appropriate performance indicators with related operations. Method: This study was a descriptive-analytical of 6 steps inc...
متن کاملInterpreting Iranian Architecture in The Post-Revolutionary Period with Interaction Model of Tectonic and Stereotomic Theory Approaches
Since tectonic and stereotomic theories have neither been used systematically nor dealt with simultaneously for the interpretation of architecture, by explaining the theoretical position of critics and their thoughts, the process of their interaction will be more effective. The main questions asked is it possible to interpret architecture through the interaction of tectonic and stereotomical th...
متن کامل