Preemptive expediting to improve project due date performance
نویسنده
چکیده
Project expediting is often viewed as a corrective action taken in response to prior scheduling errors and is usually applied in the later stages of projects when it appears that predefined due dates will not be met. However, large-scale projects with uncertain activity durations tend to have numerous probabilistic network paths with complex interactions that require some level of expediting to ensure successful scheduling outcomes. Because potential expediting options are consumed over time, delaying expediting efforts until the later stages of projects is likely to result in higher expediting costs or poorer due date performance. This research introduces a preemptive expediting approach that evaluates the probability of completion before the due date throughout the life of a project and selects expediting options per a prespecified probability tolerance or expediting budget. An experiment demonstrates the benefits of this preemptive approach. Journal of the Operational Research Society (2009) 60, 120–129. doi:10.1057/palgrave.jors.2602529 Published online 28 November 2007
منابع مشابه
A heuristic procedure for solving the dynamic probabilistic project expediting problem
Because of activity duration uncertainties, large-scale projects can often be modeled most realistically as probabilistic activity networks. The complex interactions among activities with uncertain durations virtually assures a low probability that these projects will be completed before predetermined due dates. As a result, it is often necessary to expedite individual activities in these proje...
متن کاملA Preemptive multimode resource constrained project scheduling model with cash flows
Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...
متن کاملThe preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملAn Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JORS
دوره 60 شماره
صفحات -
تاریخ انتشار 2009