Hybrid modelling of time-variant heterogeneous objects
نویسنده
چکیده
منابع مشابه
3D Modelling of Under Ground Burried Objects Based on Ground Penetration Radar
There is a growing demand for mapping and 3D modelling of buried objects such as pipelines, agricultural hetitage, landmines and other buried objects. Usually, large scale and high resolution maps from these objects are needed. Manually map generation and modeling of these objects are cost and time consuming and is dependent on lots of resources. Therefore, automating the subsurface mapping and...
متن کاملModelling the Heterogeneous Price Setting Behavior of Firms (DSGE Approach)
Despite the empirical evidence of the difference in the degree of price stickiness of goods and services, in the new standard Keynesian models, the same price stickiness is considered for all firms producing intermediate goods. In recent years, a new generation of pricing models has been introduced to simulate the heterogeneous price setting behavior in which, unlike standard pricing models, th...
متن کاملMathematical modelling of an annular photocatalytic reactor for methylene blue degradation under UV light irradiation using rGO-ZnO hybrid
The application of heterogeneous photocatalysis in industrial scale has been hindered by a lack of simple mathematical models that can be easily applied to reactor design and scale-up. This work intends to use a simple mathematical model for predicting methylene blue (MB) degradation in a slurry-annular photocatalytic reactor using zinc oxide (ZnO) hybridized with reduced graphene oxide (rGO)-Z...
متن کاملStability and numerical solution of time variant linear systems with delay in both the state and control
In this paper, stability for uncertain time variant linear systems with time delay is studied. A new sufficient condition for delay-dependent systems is given in matrix inequality form which depends on the range of delay. Then, we introduce a new direct computational method to solve delay systems. This method consists of reducing the delay problem to a set of algebraic equations by first expand...
متن کاملA Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem
Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2011