Cost of Cooperation for Scheduling Meetings
نویسندگان
چکیده
Scheduling meetings among agents can be represented as a game the Meetings Scheduling Game (MSG). In its simplest form, the two-person MSG is shown to have a price of anarchy (PoA) which is bounded by 0.5. The paper defines the Cost of Cooperation (CoC) for meetings scheduling games, with respect to different global objective functions. For an “egalitarian” objective, that maximizes the minimal gain among all participating agents, the CoC is non positive for all agents. This makes the MSG a cooperation game. The concepts are defined and examples are given within the context of the MSG. A game may be revised by adding a mediator (or with a slight change of its mechanism) so that it behaves as a cooperation game. Thus, rational participants can cooperate (by taking part in a distributed optimization protocol) and receive a payoff which will be at least as high as the worst gain expected by a game theoretic equilibrium point.
منابع مشابه
Framework of Meeting Scheduling in Computer Systems
Development of computer technologies is a necessary but not the only precondition for solving problems by means of computer supported cooperative work (CSCW). The proposed framework for meeting scheduling encompasses parameters of group members, jobs they carry out, meetings as well as scheduling procedures. In addition to knowledge and experience required for the usage of today’s powerful comp...
متن کاملScheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow
This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...
متن کاملTechnical Note: An opportunity cost maintenance scheduling framework for a fleet of ships: A case study
The conventional method towards deriving schedule for a fleet of ships to minimize cost alone has the short-coming of not addressing the problem of operation revenue losses associated with delays during maintenance at ships dockyards. In this paper, a preventive maintenance schedule for a fleet of ships that incorporates op-portunity cost is presented. The idea is to assign a penalty cost to al...
متن کاملTwo Mathematical Models for Railway Crew Scheduling Problem
Railway crew scheduling problem is a substantial part of the railway transportation planning, which aims to find the optimal combination of the trip sequences (pairings), and assign them to the crew complements. In this problem, each trip must be covered by at least one pairing. The multiple-covered trips lead to impose useless transfers called “transitions”. In this study, a new ma...
متن کاملLong Term Cost Effective Preventive Maintenance Scheduling
Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...
متن کامل