South African Journal of Industrial Engineering May 2008 Vol 19(1): 73-88 BUFFER SIZING FOR THE CRITICAL CHAIN PROJECT MANAGEMENT METHOD

نویسندگان

  • A. Geekie
  • H. Steyn
چکیده

Methods for sizing project and feeding buffers for critical chain project management are investigated. Experiments indicate that – in the absence of bias, and for certain classes of bias – buffer consumption is independent of the mean duration of a chain. Generally the popular method – a buffer size equal to 50% of the longest path leading to it – gives rise to excessively large buffers. Buffers sized according to the square root of the sum of squares perform well in the absence of bias, but with bias present the performance is unacceptably poor. A new approach to buffer sizing is proposed.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

متن کامل

Abstract Number:008-0056 Abstract Title:An investigation of time buffer into the fundamentals of critical chain project management: A behavioral perspective

Number:008-0056 Abstract Title:An investigation of time buffer into the fundamentals of critical chain project management: A behavioral perspectiveTitle:An investigation of time buffer into the fundamentals of critical chain project management: A behavioral perspective Authors information : Name: Min Zhang Organization: Huazhong University of Science and Technology Address: Huazhong University ...

متن کامل

Incorporating Return on Inventory Investment into Joint Lot-Sizing and Price Discriminating Decisions: A Fuzzy Chance Constraint Programming Model

Coordination of market decisions with other aspects of operations management such as production and inventory decisions has long been a meticulous research issue in supply chain management. Generally, changes to the original lot-sizing policy stimulated by market prices may impose remarkable deviation revenue throughout the supply and demand chain system. This paper examines how to set the chan...

متن کامل

Critical Chain Project Scheduling: Utilizing Uncertainty for Buffer Sizing

In this paper, we introduce a method for buffer sizing in Critical Chain project scheduling. Proposed approach considers lognormal distribution for modeling activities’ execution time. The inherent uncertainty of activities considered as a main factor to size the buffer in proposed method. For comparing with traditional methods we used problems presented in literature. The results depict that p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008