Reducing the Research Space of Possible Order Release Dates for Multi-level Assembly Systems under Stochastic Lead Times

نویسندگان

  • Oussama Ben Ammar
  • Hélène Marian
  • Alexandre Dolgui
  • Dash Wu
چکیده

This paper proposes tools which will be used to optimize multi-level assembly under lead time uncertainty. One type of finished products and several types of components are considered. We suppose that each component has a fixed unit inventory cost and the finished product has backlogging and inventory holding costs per unit of time. The lead times of components are discrete random variables, and the costumer’s demand of the finished product is known. A reduced space of research is presented to strengthen optimization methods which have been applied for minimizing the sum of the average inventory holding cost for components and the average backlogging and inventory holding costs for the finished product.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...

متن کامل

Multi-objective supply planning for two-level assembly systems with stochastic lead times

This paper considers two-level assembly systems whose lead times of components are stochastic with known discrete random distributions. In such a system, supply planning requires determination of release dates of components at level 2 in order to minimize expected holding cost and to maximize customer service. Hnaien et al. [Hnaien F, Delorme X, Dolgui A. Multi-objective optimization for invent...

متن کامل

Determining Optimal Number of Suppliers in a Multiple Sourcing Model under Stochastic Lead Times

Employing more than one supplier and splitting orders between them is a strategy employed in supply chains to lessen the lead-time risk in unstable environments. In this paper we present a multiple-sourcing inventory system with stochastic lead-times and constant demand controlled by a continuous review, reorder point-order quantity inventory policy. We consider the situation in which the order...

متن کامل

A novel bi-level stochastic programming model for supply chain network design with assembly line balancing under demand uncertainty

This paper investigates the integration of strategic and tactical decisions in the supply chain network design (SCND) considering assembly line balancing (ALB) under demand uncertainty. Due to the decentralized decisions, a novel bi-level stochastic programming (BLSP) model has been developed in which SCND problem has been considered in the upper-level model, while the lower-level model contain...

متن کامل

A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times

The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014