A Model for Making Part Sourcing Decisions for Long Life Cycle Products

نویسنده

  • Varun J. Prabhakar
چکیده

Long life cycle products, commonly found in aviation, medical and critical infrastructure applications, are often fielded and supported for long periods of time (20 years or more). The manufacture and support of long life cycle products rely on the availability of suitable parts, which over long periods of time, leaves the parts susceptible to a number of possible supply chain disruptions such as suppliers exiting the market, counterfeit part risks, and part obsolescence. One solution to mitigating the supply chain risk is the strategic formulation of suitable part sourcing strategies (optimally selecting one or more suppliers from which to purchase parts over the life of the part’s use within a product or within an organization). Strategic sourcing offers one way of avoiding the risk of part unavailability (and its associated penalties), but at the possible expense of qualification and support costs for multiple suppliers. Existing methods used to study part sourcing decisions are procurement-centric where cost tradeoffs focus on part pricing, negotiation practices and purchase volumes. These studies are commonplace in strategic parts management for short life cycle products; however, conventional procurement-centric approaches offer only a limited view when assessing parts used in long life cycle products. Procurement-driven decision-making provides little to no insight into the accumulation of life cycle cost (attributed to the adoption and use of the part), which can be significantly larger than procurement costs in long life cycle products. This paper presents a new life cycle modeling approach to quantify risk that enables cost effective part sourcing strategies. The method quantifies obsolescence risk as “annual expected total cost of ownership (TCO) per part site” modeled by estimating the likelihood of obsolescence and using that likelihood to determine the TCO allowing sourcing strategies to be compared on a life cycle cost basis. The method is demonstrated for electronic parts in an example case study of linear regulators and shows that when procurement and inventory costs are small contributions to the part’s TCO, the cost of qualifying and supporting a second source outweighs the benefits of extending the part’s effective procurement life.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A model for comparing sourcing strategies for parts in long life cycle products subject to long-term supply chain disruptions

Long life cycle products, commonly found in aviation, medical and critical infrastructure applications, are often fielded and supported for long periods of time (20 years or more). The manufacture and support of long life cycle products rely on the availability of suitable parts, which over long periods of time, leaves the parts susceptible to a number of possible supply chain disruptions such ...

متن کامل

An integrated model for designing a distribution network of products under facility and transportation link disruptions

Due to occurrence of unexpected disruptions,a resilient supply chain design is important. In this paper, a bi-objective model is proposed for designing a resilient supply chain including suppliers, distribution centers (DCs), and retailers under disruption risks.The first objective function minimizes total costs. The second objective function maximizes satisfied demands. We use the augmented e-...

متن کامل

A part total cost of ownership model for long life cycle electronic systems

Dedicated part selection and management groups within large OEMs are responsible for various tasks involved with managing parts or components used in electronic systems. The tasks range from part adoption to obsolescence management and include numerous assembly and support activities that are performed on a regular basis. Long life cycle electronic systems typically utilize commercial “off-the ...

متن کامل

Supplier selection in supply chain management with disruption risk and credit period concepts

Supplier selection is one of the most critical activities of purchasing management in supply chain and managers increasingly face sourcing decisions of how to selected suppliers. This paper illustrates the development of a sourcing decision that provides support for the buyer firm in supply chain.The models developed here, involved selecting between single and dual sourcing. Outside and local s...

متن کامل

An EPQ Model for Product Life Cycle (Maturity Stage) with Deteriorating Items and Shortages

  A product life cycle is the life span of a product in which the period begins with the initial product specification and ends with the withdrawal from the market of both the product and its support. A product life cycle can be divided into several stages characterized by the revenue generated by the product. This study investigates inventory control policies in a manufacturing system for a si...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011