Production planning and scheduling in the glass container industry: A VNS approach
نویسندگان
چکیده
Inspired by a case study, this paper reports a successful application of VNS to the production planning and scheduling problem that arises in the glass container industry. This is a multi-facility production system, where each facility has a set of furnaces where the glass paste is produced in order to meet the demand, being afterwards distributed to a set of parallel molding machines. Since the neighborhoods used are not nested, they are not ordered by increasing sizes, but by means of a new empirical measure to assess the distance between any two solutions. Neighborhood sizes decrease significantly throughout the search thus suggesting the use of a scheme in which efficiency is placed over effectiveness in a first step, and the opposite in a second step. We test this variant as well as other two with a real-world problem instance from our case study. & 2008 Elsevier B.V. All rights reserved.
منابع مشابه
An application of principal component analysis and logistic regression to facilitate production scheduling decision support system: an automotive industry case
Production planning and control (PPC) systems have to deal with rising complexity and dynamics. The complexity of planning tasks is due to some existing multiple variables and dynamic factors derived from uncertainties surrounding the PPC. Although literatures on exact scheduling algorithms, simulation approaches, and heuristic methods are extensive in production planning, they seem to be ineff...
متن کاملA Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملA hybrid VNS approach for the short-term production planning and scheduling: A case study in the pulp and paper industry
Mathematical formulations for production planning are increasing complexity, in order to improve their realism. In short-term planning, the desirable level of detail is particularly high. Exact solvers fail to generate good quality solutions for those complex models on medium and large-sized instances within feasible time. Motivated by a realworld case study in the pulp and paper industry, this...
متن کاملMultiple machine continuous setup lotsizing with sequence-dependent setups
We address the short-term production planning and scheduling problem coming from the glass container industry. A furnace melts the glass that is distributed to a set of parallel molding machines. Both furnace and machine idleness are not allowed. The resulting multi-machine multi-item continuous setup lotsizing problem with a common resource has sequence-dependent setup times and costs. Product...
متن کاملAn improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...
متن کامل