A limits of acceptability approach to model evaluation and uncertainty estimation in flood frequency estimation by continuous simulation: Skalka catchment, Czech Republic
نویسندگان
چکیده
[1] In this study continuous simulation flood frequency predictions on the Skalka catchment in the Czech Republic (672 km, range of altitudes from 460 to 1041 m above sea level), are compared against summary information of rainfall characteristics, the flow duration curve, and the frequency characteristics of flood discharges and snow water equivalent using the generalized likelihood uncertainty estimation limits of acceptability approach outlined by Beven (2006). Limits of acceptability have been defined, prior to running the Monte Carlo model realizations for subcatchment rainfalls, discharges (using rating data) at 5 sites within the catchment, and snowwater equivalent in 13 snow zones, 4 of which have observed data. Flood frequency and flow duration data at the outlet of the whole catchment are not used in the evaluation but are used to test the predictions. In order to get sufficient behavioral models to assess adequately the prediction uncertainty it was necessary to refine the model structure, sample the model space more densely, and, in the end, relax the limits of acceptability to allow for a strong realization effect in predicted flood frequencies. We use a procedure of scoring deviations relative to the limits of acceptability to identify the minimum extension of the limits across all criteria to obtain a sample of 4192 parameter sets that were accepted as potentially useful in prediction. Results show that individual model realizations, with the same parameter values, of similar length to the observations can vary significantly in acceptability. Long-term simulations of 10,000 years for retained models were used to obtain uncertain estimates of the 1000 year peak and associated flood hydrographs required for the assessment of dam safety at the catchment outlet.
منابع مشابه
Estimation of Design Floods Using Continuous Simulation
A common problem encountered by catchment managers is the estimation of design peak flow quantiles. Current practice, as discussed by Pilgrim (1987), is based either on the use of statistical approaches such as an at-site flood frequency analysis, or the use of a catchment modelling system to simulate catchment response to design rainfall. For many practical problems, the option of an at-site f...
متن کاملCalibration of a conceptual rainfall-runoff model for flood frequency estimation by continuous simulation
An approach is described to the calibration of a conceptual rainfall-runoff model, the Probability Distributed Model (PDM), for estimating flood frequencies at gauged sites by continuous flow simulation. A first step was the estimation of routing store parameters by recession curve analysis. Uniform random sampling was then used to search for parameter sets that produced simulations achieving t...
متن کاملConfidence intervals for a spatially generalized, continuous simulation flood frequency model for Great Britain
[1] There is growing interest in the application of ‘‘continuous simulation’’ conceptual rainfall-runoff models for flood frequency estimation as an adjunct to event-based or statistical design methodology. The approach has advantages that stem from the use of models with continuous water balance accounting. Conceptual rainfall-runoff models usually require calibration, which in turn requires g...
متن کاملFlood Hydrograph Simulation with Uncertainty in Rainfall - Runoff Parameters
Flood hydrograph simulation is affected by uncertainty in Rainfall – Runoff )RR( parameters. Uncertainty of RR parameters in Gharasoo catchment, part of the great Karkheh river basin, is evaluated by Monte–Carlo (MC) approach. A conceptual-distributed model, called ModClark, was used for basin simulation, in which the basin’s hydrograph was determined using the superposition of runoff generated...
متن کاملFlood Hydrograph Simulation with Uncertainty in Rainfall - Runoff Parameters
Flood hydrograph simulation is affected by uncertainty in Rainfall – Runoff )RR( parameters. Uncertainty of RR parameters in Gharasoo catchment, part of the great Karkheh river basin, is evaluated by Monte–Carlo (MC) approach. A conceptual-distributed model, called ModClark, was used for basin simulation, in which the basin’s hydrograph was determined using the superposition of runoff generated...
متن کامل