Study on the Application of the Kent Index Method on the Risk Assessment of Disastrous Accidents in Subway Engineering

نویسندگان

  • Hao Lu
  • Mingyang Wang
  • Baohuai Yang
  • Xiaoli Rong
چکیده

With the development of subway engineering, according to uncertain factors and serious accidents involved in the construction of subways, implementing risk assessment is necessary and may bring a number of benefits for construction safety. The Kent index method extensively used in pipeline construction is improved to make risk assessment much more practical for the risk assessment of disastrous accidents in subway engineering. In the improved method, the indexes are divided into four categories, namely, basic, design, construction, and consequence indexes. In this study, a risk assessment model containing four kinds of indexes is provided. Three kinds of risk occurrence modes are listed. The probability index model which considers the relativity of the indexes is established according to the risk occurrence modes. The model provides the risk assessment process through the fault tree method and has been applied in the risk assessment of Nanjing subway's river-crossing tunnel construction. Based on the assessment results, the builders were informed of what risks should be noticed and what they should do to avoid the risks. The need for further research is discussed. Overall, this method may provide a tool for the builders, and improve the safety of the construction.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

ارزیابی ریسک های ایمنی بر اساس منطق فازی در پروژه های ساخت مترو

Introduction: Organizations, manufacturing and non-manufacturing companies, and development units are always associated with incidents and the need for proper risk assessment. One of these is the process of constructing subwayways that, given its nature, require special attention and the occurrence of accidents is always there. But as risk definition is clear, risk is always associated with unc...

متن کامل

Assessment and Prioritizing the Risks of Urban Rail Transportation by Using Grey Analytical Hierarchy Process (GAHP)

Some incidents in urban railway systems affect the function of the subway’s company adversely and they could disorder the services. These events may inflict irreparable damage to passengers, employees and equipment. By recognizing the hazards existing in this type of transportation system and evaluating and prioritizing risks, we can perform appropriate actions to reduce the probability and sev...

متن کامل

Assessment of the Risk of Individual and Occupational Factors Affecting the Causes of Occupational Accidents in the Construction Industry Using the Fuzzy Hierarchical Analysis Approach: A Case Study in Kurdistan Province, Iran

Background and Aim: Based on the Iranian Social Security Organization statistics, in 2012 the accidents occurring in the construction industry accounted for 26% of all the occupational accidents in the country. Therefore, this study was conducted to identify the individual and occupational risk factors affecting the causes of occupational accidents in this industry using the fuzzy hierarchical ...

متن کامل

Risk prediction based on a time series case study: Tazareh coal mine

In this work, the time series modeling was used to predict the Tazareh coal mine risks. For this purpose, initially, a monthly analysis of the risk constituents including frequency index and incidence severity index was performed. Next, a monthly time series diagram related to each one of these indices was for a nine year period of time from 2005 to 2013. After extrusion of the trend, seasonali...

متن کامل

Presenting a semi-quantitative model based on the resiliency engineering management commitment index in assessing the level of preparedness against emergency situations of hospitals in a fuzzy environment (case study: selected Faraja hospitals in 202

Abstract Background and Objective: The main index in resilience engineering is the management commitment index. In this study, a semi-quantitative risk assessment method based on the fuzzy hierarchical analysis method for management commitment index was implemented in evaluating the resilience level of two selected hospitals. Materials and methods: At first, evaluation tools including a 17-qu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 2013  شماره 

صفحات  -

تاریخ انتشار 2013