A pilot study examining changes in dust lead loading on walls and ceilings after lead hazard control interventions.

نویسندگان

  • E Tohn
  • S Dixon
  • R Rupp
  • S Clark
چکیده

The U.S. Department of Housing and Urban Development (HUD) guidelines on lead hazard control instruct contractors to clean floors, windows, walls, ceilings, and other horizontal surfaces to remove lead-contaminated dust and debris after lead interventions are conducted. This dust removal activity adds costs to each project. The need to clean floors and windows is well documented in the HUD guidelines. However, there is substantially less documentation to support the recommendation to clean walls and ceilings. We examined whether it is necessary to clean walls and ceilings after lead hazard control (LHC) interventions by comparing dust lead loadings measured on these surfaces before an LHC intervention to dust lead loadings after the intervention. Twenty-two dwelling units undergoing substantial LHC measures consistent with the HUD guidelines were enrolled in the study. There was a significant increase in dust lead loading on walls and ceilings between the pre- and postintervention. The change in wall dust lead loading was substantial and created potentially harmful lead exposures. Although statistically significant, the change in ceiling dust lead loading was minimal and the postintervention dust lead loadings were far below the existing federal floor dust lead clearance standard. These results strongly support the recommendations in the HUD guidelines to clean walls after LHC interventions and do not provide sufficient justification to alter the current recommendation to clean ceilings after lead work.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

HOW MUCH CLEANING IS ENOUGH? AN EVALUATION OF ALTERNATIVE POST-LEAD HAZARD INTERVENTION CLEANING PROCEDURES By:

This study evaluated and compared two procedures to clean lead dust and debris after lead hazard control activities were completed in housing with lead-based paint hazards. 1995 Federal guidelines prepared by the U.S. Department of Housing and Urban Development for the control of lead-based paint hazards in housing strongly recommend that after lead hazard control interventions all walls, ceili...

متن کامل

Evaluation of the HUD lead hazard control grant program: early overall findings.

This study evaluates the effectiveness of lead hazard control methods used in the Lead Hazard Control (LHC) grant program of U.S. Department of Housing and Urban Development. The LHC Program awards funds to local jurisdictions to address lead hazards in privately owned, low-income dwellings. Grantees in 14 cities, states, or counties collected environmental data in over 2600-treated dwellings m...

متن کامل

An evaluation of one-time professional cleaning in homes with lead-based paint hazards.

A key challenge in reducing the burden of lead poisoning is to identify cost-effective interventions that minimize lead-based paint hazards. One-time professional cleaning of lead-contaminated dust and debris was conducted in 37 housing units with deteriorated lead-based paint and dust lead hazards. These study units are a subset of a larger cohort of the nearly 3500 housing units enrolled in t...

متن کامل

Selecting a lead hazard control strategy based on dust lead loading and housing condition: I. Methods and results.

A methodology was developed to classify housing conditions and interior dust lead loadings, using them to predict the relative effectiveness of different lead-based paint hazard control interventions. A companion article in this issue describes how the methodology can be applied. Data from the National Evaluation of the HUD Lead Hazard Control Grant Program, which covered more than 2800 homes i...

متن کامل

Evaluation of HUD-funded lead hazard control treatments at 6 years post-intervention.

The Evaluation of the HUD Lead-Based Paint Hazard Control Grant Program (Evaluation) was a HUD-funded study of the effectiveness of lead hazard control (LHC) treatments conducted by 14 grantees in communities across the country. A stratified random sampling scheme was used to select treated units at four grantee sites for continued environmental assessment at 6 years post-intervention. The stud...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Environmental Health Perspectives

دوره 108  شماره 

صفحات  -

تاریخ انتشار 2000