Collar Option Model for Managing the Cost Overrun Caused by Change Orders
نویسندگان
چکیده
Effective change order management is very important in maintaining the financial sustainability of various stakeholders related to construction projects by minimizing cost overruns. In this study, we propose a zero-cost risk management approach based on the collar option model in order to control for the loss caused by change orders, the main cause of cost overruns in construction projects. We apply this model to actual projects for empirical analysis. The analysis, based on 237 projects, indicates that insurance buyers benefit from the collar option model in 46% of the cases, while insurance sellers do so in 53% of the cases. In most cases, the insurance buyer is the owner. According to the model, the owner experiences a loss when the cost overrun caused by change orders is lower than what was expected. In such cases, it is appropriate to conclude that the loss is not caused by the collar option model, but by the absence of additional revenue. However, the insurance seller suffers a loss if the cost overrun is higher than the strike price of the call option. Thus, the insurance seller needs to have expertise in construction management.
منابع مشابه
SAP-ERP Implementation: Change Management Model using Qualitative Approach
Research reports provide evidence of high failure rates of Enterprise Resource Planning (ERP) implementation projects in terms of cost overrun, schedule overrun and failure to achieve desired objectives. One of the core identified reason is unwanted attitude from the core business users during the ER-SAP implementation process. Unlike advanced countries, organizations in developing markets face...
متن کاملQualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects
Nowadays projects are more complicated involving huge contract values, participants from multi-discipline, more specialized works, tighter schedule, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that plays significant role in a project success. The study focuses on multiple Design and Build (D&B) project which has complicated risk and is governed by fixe...
متن کاملA Zero-Cost Collar Option Applied to Materials Procurement Contracts to Reduce Price Fluctuation Risks in Construction
This study proposes a materials procurement contracts model to which the zero-cost collar option is applied for heading price fluctuation risks in construction.The material contract model based on the collar option that consists of the call option striking zone of the construction company(the buyer) following the materials price increase andthe put option striking zone of the material vendor(th...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملA chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability
A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...
متن کامل