Achieving the Shortest Clock Period byInserting the Minimum Amount of

نویسندگان

  • Shangzhi Sun
  • David H. C. Du
  • Guoliang Xue
چکیده

The performance of a circuit depends on its clock period. The shorter a valid clock period is, the better the performance is. The clock period is tightly related to the diierence between the longest propagation delay and the shortest propagation delay from primary inputs to primary outputs. The objective of this paper is to minimize the amount of delay inserted while achieving the shortest clock period. Inserting delay buuers is done after traditional delay optimization. We propose an optimal algorithm based on a novel linear programming formulation. Our algorithm can also be used to solve similar delay buuer problems.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Achieving Minimum Learning Requirements in Ophthalmology Ward: the Viewpoints of Interns in School of Medicine

Introduction: Evidences show that current educational programs do not correspond to after graduation needs of physicians and occasionally cause problems for both physicians and recipients of services. Current study has determined the opinion of interns about achieving minimum learning requirements in ophthalmology ward. Methods: A descriptive study was done in the Medical School of Isfahan Me...

متن کامل

Practical Fast Clock-Schedule Design Algorithms

SUMMARY In this paper, a practical clock-scheduling engine is introduced. The minimum feasible clock-period is obtained by using a modified Bellman-Ford shortest path algorithm. Then an optimum cost clock-schedule is obtained by using a bipartite matching algorithm. It also provides useful information to circuit synthesis tools. The experiment to a circuit with about 10000 registers and 100000 ...

متن کامل

Management ecosystem by Assessment of plant covers changes (Case study: Taleghan Township)

For an optimum use of natural resources in the sustainable development trend, there is a need to identify ecological resources in the shortest period of time and minimum possible cost. In this article, we aimed Management ecosystem by Assessment of plant covers changes at Taleghan Township in a twenty year period. Percentage of landscape and number of patch were among the metrics that were calc...

متن کامل

Management ecosystem by Assessment of plant covers changes (Case study: Taleghan Township)

For an optimum use of natural resources in the sustainable development trend, there is a need to identify ecological resources in the shortest period of time and minimum possible cost. In this article, we aimed Management ecosystem by Assessment of plant covers changes at Taleghan Township in a twenty year period. Percentage of landscape and number of patch were among the metrics that were calc...

متن کامل

Management ecosystem by Assessment of plant covers changes (Case study: Taleghan Township)

For an optimum use of natural resources in the sustainable development trend, there is a need to identify ecological resources in the shortest period of time and minimum possible cost. In this article, we aimed Management ecosystem by Assessment of plant covers changes at Taleghan Township in a twenty year period. Percentage of landscape and number of patch were among the metrics that were calc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007