A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups

نویسندگان

  • Xiuli Wang
  • T. C. Edwin Cheng
چکیده

This paper studies the two-machine flowshop scheduling problem with class setups in a no-wait processing environment to minimize the maximum lateness. The jobs are divided into job classes and a setup is required at the initial processing of a job or between the processing of jobs of different classes. In a no-wait environment, a job must be processed from start to finish without interruptions on a machine or between the machines. A batch is a maximal subset of consecutively processed jobs of the same class. Several properties concerning the beneficial merging of batches and some dominance rules that improve the objective function are derived. Since the problem is NP-hard, a heuristic is proposed and evaluated computationally. The numerical results demonstrate that the heuristic can produce near-optimal solutions quickly for realistic-sized problems.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Solving Re-entrant No-wait Flow Shop Scheduling Problem

In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...

متن کامل

َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

متن کامل

Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors

This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...

متن کامل

Flexible flowshop scheduling with equal number of unrelated parallel machines

This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 33  شماره 

صفحات  -

تاریخ انتشار 2006