A business process activity model and performance measurement using a time series ARIMA intervention analysis

نویسندگان

  • C. Y. Lam
  • Andrew W. H. Ip
  • Henry C. W. Lau
چکیده

The degree of performance excellence that an enterprise can achieve greatly depends on the business process flow that the enterprise adopts, where the more efficient and effective the business process flow, the greater the degree of performance excellence the enterprise can achieve. Most conventional business process analyses focus on qualitative methodologies, but these lack solid measurement for supporting the business process improvement. Therefore, a quantitative methodology using an activity model that is described in this paper is proposed. This model involves the use of an adjacent matrix to empirically identify inefficient and ineffective activity looping, after which the business process flow can then be improved. With the proposed quantitative methodology, a time series intervention ARIMA model is used to measure the intervention effects and the asymptotic change in the simulation results of the business process reengineering that is based on the activity model analysis. The approach is illustrated by a case study of a purchasing process of a household appliance manufacturing enterprise that involves 20 purchasing activities. The results indicate that the changes can be explicitly quantified and the effects of BPR can be measured. 2008 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Comparison among ARIMA and hybrid ARIMA-GARCH Models in Forecasting the Exchange Rate of Iran

This paper attempts to compare the forecasting performance of the ARIMA model and hybrid ARMA-GARCH Models by using daily data of the Iran’s exchange rate against the U.S. Dollar (IRR/USD) for the period of 20 March 2014 to 20 June 2015. The period of 20 March 2014 to 19 April 2015 was used to build the model while remaining data were used to do out of sample forecasting and check the forecasti...

متن کامل

Assessment of BAM with ANP Approach; Case Study: Bank Sepah

In today's business environment in which coordination and adaptation with constant changes are the only ways of survival, real-time monitoring of activities and making the decisions accordingly are necessary. Since performance measurement cannot be managed independent of business processes, Business Activity Monitoring (BAM) systems should monitor performance metrics based on business processes...

متن کامل

Assessment of BAM with ANP Approach; Case Study: Bank Sepah

In today's business environment in which coordination and adaptation with constant changes are the only ways of survival, real-time monitoring of activities and making the decisions accordingly are necessary. Since performance measurement cannot be managed independent of business processes, Business Activity Monitoring (BAM) systems should monitor performance metrics based on business processes...

متن کامل

Prediction of the Type and Amount of Surface Water Pollutants using Time Series Models (ARIMA) and L-THIA Model (Case Study: Namrood Sub-Basin, Hablehrood Watershed)

     Due to the important role of non-point source pollution in water resources management, in this study time series modeling was applied to forecast water quality parameters and L-THIA model (one type of non-point source pollution models) was applied to estimate water pollutants. The purpose of this study was to compare results of L-THIA model and ARIMA models in Namrood sub-basin located in ...

متن کامل

Using Machine Learning ARIMA to Predict the Price of Cryptocurrencies

The increasing volatility in pricing and growing potential for profit in digital currency have made predicting the price of cryptocurrency a very attractive research topic. Several studies have already been conducted using various machine-learning models to predict crypto currency prices. This study presented in this paper applied a classic Autoregressive Integrated Moving Average(ARIMA) model ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 36  شماره 

صفحات  -

تاریخ انتشار 2009