Heuristic algorithms for two-machine flowshop with availability constraints
نویسندگان
چکیده
The majority of the scheduling studies carry a common assumption that machines are available all the time. However, machines may not always be available in the scheduling period due to breakdown or preventive maintenance. Taking preventive maintenance activity into consideration, we dealt with the twomachine flowshop scheduling problem with makespan objective. The preventive maintenance policy in this paper was dependent on the number of finished jobs. The integer programming model was proposed. We combined two recent constructive heuristics, HI algorithm and H algorithm, with Johnson’s algorithm, and named the combined heuristic H&J algorithm. We also developed a constructive heuristic, HD, with time complexities O(n). Based on the difference in job processing times on two machines, both H&J and HD showed good performance, and the latter was slightly better. The HD algorithm was able to obtain the optimality in 98.88% of cases. We also employed the branch and bound (B&B) algorithm to obtain the optimum. With a good upper bound and a modified lower bound, the proposed B&B algorithm performed significantly effectively. 2008 Elsevier Ltd. All rights reserved.
منابع مشابه
Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کامل3/2-approximation for Two-machine No-wait Flowshop Scheduling with Availability Constraints
We consider in this paper the two-machine no-wait flowshop problem in which each machine may have an unavailable interval. We present 3 2 -approximation algorithms for the problem when the unavailable interval is imposed on only one machine, or the unavailable intervals on the two machines overlap. These algorithms improve on existing results.
متن کاملHybrid Flowshop with Unrelated Machines, Sequence Dependent Setup Time and Availability Constraints: An Enhanced Crossover Operator for a Genetic Algorithm
This paper presents a genetic algorithm for a scheduling problem frequent in printed circuit board manufacturing: a hybrid flowshop with unrelated machines, sequence dependent setup time and machine availability constraints. The proposed genetic algorithm is a modified version of previously proposed genetic algorithms for the same problem. Experimental results show the advantages of using new c...
متن کاملDevelopment of a Set of Algorithms for the Multi-Project Scheduling Problems
In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the generalized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due da...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 56 شماره
صفحات -
تاریخ انتشار 2009