Contracting for wind generation

نویسندگان

  • David Newbery
  • David M Newbery
چکیده

From four hours out the error in predicting wind output typically exceeds 10% MAE(perhaps 15% RMSE). Given the asymmetry in imbalance penalties from being short or long,the optimal forward contract of wind might be expected to be less than the expected output.This note derives the optimal ex ante contract position and …nds that if wind is uncorrelatedwith the system imbalance, this argument does not necessarily hold. For a symmetric errordistribution whether to under or over-contract depends on whether the expected long penaltyexceeds the expected short penalty for a risk-neutral producer. 1 The GB Balancing Mechanism In the GB Balancing Mechanism, balancing parties who are short (i.e. have contracted to delivermore than they actually produce, or have consumed more than they contracted to buy) will paythe System Buy Price (SBP). If the system as a whole is short, the SBP will be higher thanthe spot price (SP, i.e. the day-ahead price for that half-hour). If the system is long when thebalancing party is short, the party is helping to reduce the imbalance, and consequently is notpenalised (but nor is he rewarded) and buys at the spot price, SP. He therefore faces a penaltyequal to SBP-SP = PS if short when the system is short, and otherwise zero.Conversely, if the balancing party is long he receives the System Sell Price (SSP), and if thesystem is also long, the SSP will be below the SP, but if the system is short and the balancingparty is helping reduce the shortage, he is paid the SP and so faces no penalty (and again noreward). The relevant penalty is thus SP-SSP = PL if long when the system is long, and otherwisezero. The penalty when short is considerably higher than when long (i.e. PS >PL) and theratio of PS=PL was nearly 4 in 2006/7 and over 2 in 2008/9. One might expect that as it is morecostly to be short than long, balancing parties would aim to be long, and that is what we …nd, Research support from ESRC under project RES-189-250155 is gratefully acknowledged. I am indebted toDominik Ruderer for his comments.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling security constraint unit commitment for power system including stochastic wind power generation

This paper introduces a new approach for scheduling security constraint unit commitment (SCUC) including wind farms. Because of uncertainty in wind power production, we tried to develop a new method for incorporating wind power generation in power plant scheduling. For this, wind power generation modeled with unit commitment in a non-linear optimization problem and simulated by submitting diffe...

متن کامل

A Fast Calculation Method for Analyzing the Effect of Wind Generation on ATC

Wind energy penetration in power system has been increased very fast and large amount of capitals invested for wind farms all around the world. Meanwhile, in power systems with wind turbine generators (WTGs), the value of Available transfer capability (ATC) is influenced by the probabilistic nature of the wind power. The Mont Carlo Simulation (MCS) is the most common method to model the uncerta...

متن کامل

یکپارچه‌سازی بهینه انرژی باد در برنامه‌ریزی توسعه تولید انرژی الکتریکی با در نظر گرفتن نوسانات و عدم قطعیت

Wind Power generation integrated in electrical power system can cause of variation and uncertainty which must be considered in process of generation expansion planning (GEP). The goal of this study is to model the GEP problem integrated with wind power generation and introduce the fuzzy-probability model to consider variation and uncertainty of wind power generation. To verify and optimize the ...

متن کامل

Weekly self-scheduling, forward contracting, and pool involvement for an electricity producer. An adaptive robust optimization approach

This paper addresses the optimization under uncertainty of the self-scheduling, forward contracting, and pool involvement of an electricity producer operating a mixed power generation station, which combines thermal, hydro and wind sources, and uses a two stage adaptive robust optimization approach. In this problem the wind power production and the electricity pool price are considered to be un...

متن کامل

Reliability Assessment of Power Generation Systems in Presence of Wind Farms Using Fuzzy Logic Method

A wind farm is a collection of wind turbines built in an area to provide electricity. Wind power is a renewable energy resource and an alternative to non-renewable fossil fuels. In this paper impact of wind farms in power system reliability is investigate and a new procedure for reliability assessment of wind farms in HL1 level is proposed. In proposed procedure, application of Fuzzy – Markov f...

متن کامل

Economic assessment of renewable power generation based on wind speed and solar radiation in urban regions

Economic evaluation of 12 MW grid-connected wind farms and PV power plants in two regions in Northern Cyprus for electricity generation was investigated. The wind speed, sunshine duration, and solar global radiation characteristics were analyzed using monthly data collected over 17 years (2000-2016) for Girne and nine years (2008-2016) for Lefkoşa, which were measured at various heights. The re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011