Prediction Model for Hoisting Time Using Luffing-type Crane for High-rise Building Construction

نویسندگان

  • Yoonseok Shin
  • Chang-Yeon Cho
  • Jung-Yeol Kim
  • Heebok Choi
  • Moon-Young Cho
چکیده

Hoisting planning for systematic and efficient vertical transportation is one of the key factors for successful completion in high-rise building construction. However, despite this importance, minimal research has been carried out for predicting hoist time, which is a key player in hoisting planning. Therefore, this study proposed a prediction model for vertical hoisting time using a luffing-type crane. From the results, validation of the model showed the potentiality to apply the actual prediction of hoisting time of a luffing-type crane after additional research.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

TOWER CRANES AND SUPPLY POINTS LOCATING PROBLEM USING CBO, ECBO, AND VPS

Tower cranes are major and expensive equipment that are extensively used at building construction projects and harbors for lifting heavy objects to demand points. The tower crane locating problem to position a tower crane and supply points in a building construction site for supplying all requests in minimum time, has been raised from more than twenty years ago. This problem has already been so...

متن کامل

Simulation of Smoke Emission from Fires in High-Rise Buildings Using the 3D Model Generated from 2-Dimensional Cadastral Data

Having a 3-Dimensional model of high-rise buildings can be used in disaster management such as fire cases to reduce casualties. The fundamental dilemma in 3D building modeling is the unavailability of suitable data sources. However, available cadastral 2D maps could be used as low-cost and attainable resources for 3D building modeling. Smoke will be a great threat to people's health during a f...

متن کامل

Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System

The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...

متن کامل

Safety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S

Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...

متن کامل

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011