Management of Safety Requirements in Subcontracting during the Olkiluoto 3 Nuclear Power Plant Construction Phase Contents

ثبت نشده
چکیده

The Radiation and Nuclear Safety Authority (STUK) concluded in connection with the construction of the Olkiluoto 3 nuclear power plant that the performance of the organisations involved in the project and the interaction between the organisations did not in all respects meet the expectations that STUK has on good safety culture during the construction phase of a power plant. The identified problems had already impeded progress of the project and possibly increased schedule-related pressures during the later stages of the project. STUK considers important that problems during construction and manufacturing will not result in impaired quality of the final products, or even in uncertainty about the achieved quality. For this reason, the performance of the organisations involved in the construction of the Olkiluoto 3 nuclear power plant unit should be improved. In order to identify the needs for improvement, STUK appointed an investigation team and asked the team to present an assessment of the performance of the organisations in the light of certain case studies that were selected as examples. In addition, STUK asked the investigation team to present recommendations for improving the performance of the licensee Teollisuuden Voima Oy (TVO), and the vendor consortium CFS, formed by Framatome ANP (FANP, currently Areva NP) and Siemens AG. Within the project, Framatome is responsible for the reactor island and Siemens for the turbine island. As the construction project proceeds, STUK will assess how these recommendations have been materialized in the operations of the parties. The investigation team also analysed the needs for development in STUK's own operations and issued recommendations for this purpose. The task given to the investigation team is shown in Appendix 1, and the composition of the team in Appendix 2. The investigation entailed interviews of persons in different capacities in organizations (TVO, CFS, FANP, subcontractor, research institute) that have taken part in the Olkiluoto 3 project, as well as a visit to the Olkiluoto 3 construction site and the concrete batching plant. The investigation programme is shown in Appendix 3. Appendix 4 contains a description of STUK's activities as the regulatory organisation for the nuclear power plant construction project. In safety-critical fields the organisations are expected to possess an ability also to manage situations that are difficult to predict. The characteristics of organisations operating with high reliability include a serious attitude towards even small errors, an overall assessment of situations, emphasis on professional competence over organisational status, …

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Role of Human Factor in Energy Conservation: Case of Bushehr Nuclear Power Plant

Humans are an integral part of power plants, ranging from construction to routine maintenance. Analysis of the presence and performance of the human factor can play an effective role in reducing and/or optimizing the use of energy resources. Therefore, in this research the investigation of the plant operator's presence direction in order to control a type of accident with the implementation of ...

متن کامل

Role of Human Factor in Energy Conservation: Case of Bushehr Nuclear Power Plant

Humans are an integral part of power plants, ranging from construction to routine maintenance. Analysis of the presence and performance of the human factor can play an effective role in reducing and/or optimizing the use of energy resources. Therefore, in this research the investigation of the plant operator's presence direction in order to control a type of accident with the implementation of ...

متن کامل

Safety Analysis of Spent Fuel Transportation Cask of Bushehr Nuclear Power Plant through the Passing of Fire Tunnel with ANSYS®10.0

The spent fuel assemblies (FAs) of Bushehr Nuclear Power Plant are planed to be transported by TK-13 casks. Each spent fuel transportation cask holds 12 spent FAs and has a thick steel container to provide shielding. The calculations have been performed for FAs with burn ups of 60 MWd/kg and a 3-years cooling period. The ANSYS®10.0 general finite element analysis package was se...

متن کامل

Investigating the Impact of Safety Investment on Safety Culture in Construction Projects - Case Study of Power Plant Construction Projects

Background and aims: Construction industry is known as one of the most perilous industries in that it is involving the hazardous projects as well as the high manpower activities correlating with a high rate of work-related accidents. On the other hand, the high rate of accidents in the industry demanding a big budget for the damages; therefore, safety is strongly emphasized in the construction ...

متن کامل

Challenges of requirements engineering - A case study in nuclear energy domain

The successful practices of requirements engineering vary between application domains and are characterized by the nature of the application domain. One relatively peculiar application domain is the nuclear energy domain, which is characterized by the long life cycle of power plant operation and construction project, strict control of safety, and collaboration between several stakeholder groups...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006