Experiences with Model-based Product Line Engineering for Developing a Family of Integrated Control Systems: an Industrial Case Study

نویسندگان

  • Tao Yue
  • Lionel Briand
  • Bran Selic
  • Qitao Gan
چکیده

Integrated Control Systems (ICSs) are often large-scale and highly configurable software-intensive systems-of-systems, with software and hardware components integrated to control and monitor physical devices and processes (e.g., oil and gas production platforms). Employing Product Line Engineering (PLE) is believed to bring potential benefits with respect to reduced cost, higher productivity, higher quality, and faster time-tomarket. However, relatively few industrial field studies are reported regarding the application of PLE to develop large-scale systems, and more specifically ICSs. In this paper, we report about our experiences and insights gained from investigating the application of model-based PLE at FMC Technologies, a company developing subsea production systems (typical ICSs) to manage the exploitation of oil and gas production fields. We first discuss the benefits and challenges of applying systematic domain analysis-the first major step of PLE, report on the key domain analysis results and then assess the benefits and challenges of employing model-based PLE at FMC, as a means to improve the quality of their products and the productivity of their product development process. Keywords-Product Line Engineering; Integrated Control System (ICS); Domain Analysis; Model-based Product Line Engineering.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated Approach for Cellular Manufacturing a Case Study (TECHNICAL NOTE)

To cope with fast changing customer requirements, industrial demands and to meet stringent specifications of customers Cellular Manufacturing Systems has become an effective tool in hands of manufacturers. Most of the published literature on cell formation earlier considers only the data available in the route sheets and ignored subproblems associated with cell formation. There is a need to dev...

متن کامل

An algorithm for integrated worker assignment, mixed-model two-sided assembly line balancing and bottleneck analysis

This paper addresses a multi-objective mixed-model two-sided assembly line balancing and worker assignment with bottleneck analysis when the task times are dependent on the worker’s skill. This problem is known as NP-hard class, thus, a hybrid cyclic-hierarchical algorithm is presented for solving it. The algorithm is based on Particle Swarm Optimization (PSO) and Theory of Constraints (TOC) an...

متن کامل

Tactical and operational planning for socially responsible fresh agricultural supply chain

Addressing an integrated decision-making structure for planting and harvesting scheduling may lead to more realistic, accurate, and efficient decision in fresh product supply chain. This study aims to develop an integrated bi-objective tactical and operational planning model for producing and distributing fresh crops. The first objective of the model is to maximize total revenue of supply chain...

متن کامل

Using Markov Chain to Analyze Production Lines Systems with Layout Constraints

There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of lin...

متن کامل

An integrated heuristic method based on piecewise regression and cluster analysis for fluctuation data (A case study on health-care: Psoriasis patients)

Trend forecasting and proper understanding of the future changes is necessary for planning in health-care area.One of the problems of analytic methods is determination of the number and location of the breakpoints, especially for fluctuation data. In this area, few researches are published when number and location of the nodes are not specified.In this paper, a clustering-based method is develo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012