Iterative Improvement Methods for Knowledge-Based Scheduling
نویسنده
چکیده
For large industrial applications the constraint-based formulation of scheduling problems fits better than mathematical representations from Operational Research, because the constraint approach is more flexible and can be adapted more easily to organizational changes in the production. However, the search for a good solution for realistic applications can be very expensive and furthermore, in scheduling one is not only interested in a feasible solution but also in an opti-
منابع مشابه
Network Planning Using Iterative Improvement Methods and Heuristic Techniques
The problem of minimum-cost expansion of power transmission network is formulated as a genetic algorithm with the cost of new lines and security constraints and Kirchhoff’s Law at each bus bar included. A genetic algorithm (GA) is a search or optimization algorithm based on the mechanics of natural selection and genetics. An applied example is presented. The results from a set of tests carried ...
متن کاملA knowledge-based NSGA-II approach for scheduling in virtual manufacturing cells
This paper considers the job scheduling problem in virtual manufacturing cells (VMCs) with the goal of minimizing two objectives namely, makespan and total travelling distance. To solve this problem two algorithms are proposed: traditional non-dominated sorting genetic algorithm (NSGA-II) and knowledge-based non-dominated sorting genetic algorithm (KBNSGA-II). The difference between these algor...
متن کاملIterative Improvement Algorithms for the Blocking Job Shop
This paper provides an analysis of the efficacy of a known iterative improvement meta-heuristic approach from the AI area in solving the Blocking Job Shop Scheduling Problem (BJSSP) class of problems. The BJSSP is known to have significant fallouts on practical domains, and differs from the classical Job Shop Scheduling Problem (JSSP) in that it assumes that there are no intermediate buffers fo...
متن کاملConstraint Technology Applied to Forest Treatment Scheduling
Forest treatment planning and scheduling is an important part of forest resource management. It is a complex task requiring expertise and integration of multi-disciplinary fields. In this paper, we outline a real life problem from the ECOPLAN project called the Long Term Forest Treatment Scheduling Problem (LTFTSP). A review of optimization techniques applicable to forest treatment problems in ...
متن کاملPlanning Support to Software Process Evolution
The ability to handle changes is a characteristic feature of successful software projects. The problem addressed in this paper is what should be done in project planning and iterative replanning so that the project can react effectively to changes. Thus the work presents research results in software engineering, as well as transfer of methods in knowledge engineering to software engineering, ap...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- AI Commun.
دوره 8 شماره
صفحات -
تاریخ انتشار 1995