A probabilistic (max, +) approach for determining railway infrastructure capacity
نویسندگان
چکیده
We consider the problem of determining the capacity of a planned railway infrastructure layout under uncertainties In order to address the long term nature of the problem in which the exact future demand of service is un known we develop a timetable free approach to avoid the speci cation of a particular timetable We consider a generic infra element that allows a con cise representation of many di erent combinations of infrastructure safety systems and tra c regimes such as mixed double and single track lines e g a double track line including a single tunnel tube and train operations on partly overlapping routes at station yards We translate the capacity assess ment problem for such a generic infra element into an optimization problem and provide a solution procedure We illustrate our approach with a capac ity assessment for the newly built high speed railway line in the Netherlands
منابع مشابه
Methodological Review for Capacity and Punctuality Assessment Procedures
Climate change, congestion, safety, energy consumption and pollution are among the major issues that the European :::union::: and the wider world are facing nowadays. The European Commission is working towards the creation of a Single European Railway Area, encouraging a modal shift towards rail (mainly from road) in order to achieve a more competitive and sustainable European transport syst...
متن کاملA discrete-event optimization framework for mixed-speed train timetabling problem
Railway scheduling is a complex task of rail operators that involves the generation of a conflict-free train timetable. This paper presents a discrete-event simulation-based optimization approach for solving the train timetabling problem to minimize total weighted unplanned stop time in a hybrid single and double track railway networks. The designed simulation model is used as a platform for ge...
متن کاملA Methodology to Prioritize the Construction Projects of New Railway Infrastructures for Privatization in Railway Networks (Case Study: Iran)
This study aims to develop a novel methodology to prioritize the construction of new railway infrastructures for privatization. The private sector can cooperate to solve the capacity problems of railway networks, by the construction of new infrastructure. The purpose of this study is to answer the basic question that whether the capacity problems of the railway networks can be solved simply by ...
متن کاملThe Safety Level of Railway Infrastructure and Its Correlation with the Cost of Preventive and Mitigation Measures
This paper develops a methodology which allows the correlation between the cost which is required for the application of preventive and mitigation measures dealing with accidents which occur within a railway system and the improvement of the level of safety as a result from their implementation. The safety level is expressed either quantitatively, by the decrease of “fatality risk” indicator...
متن کاملRailway infrastructure saturation using Constraint Programming approach
Railway infrastructure managers now have to deal with the new operators' requests for capacity. Planning the new construction or reconstruction of infrastructures must be carried out very carefully due to the huge investment needed. This paper studies a Constraint Programming (CP) model of the 'Railway Infrastructure Saturation Problem" (RISP). The model applies to assess the capacity of a junc...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 148 شماره
صفحات -
تاریخ انتشار 2003