International Journal of Management Science and Engineering Management
نویسندگان
چکیده
In this paper, we discuss the discrete-time Geom/G/1 queue with multiple adaptive vacations and server setup/closedown times. We consider two types of closedown time policies which differ from each other in the completion instant of the closedown times and contrast the effects of them on the queueing system. We derive the probability generating functions (PGFs) and stochastic decomposition results of the steady-state queue length and waiting time distributions through the method of embedded Markov chain in both cases. Many discussed models related to Geom/G/1 queue are special cases of our model.
منابع مشابه
Joint pricing and production management: a geometric programming approach with consideration of cubic production cost function
Coordination and harmony between different departments of a company can be an important factor in achieving competitive advantage if the company corrects alignment between strategies of different departments. This paper presents an integrated decision model based on recent advances of geometric programming technique. The demand of a product considers as a power function of factors such as produ...
متن کاملFlexible resource management and its effect on project cost and duration
In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...
متن کاملCongestion Management in Electricity Markets Using Demand Response Programs and Series FACTS Devices
In today’s restructured environment, congestion management plays an essential role in power system operation. Different methods are presented and discussed in this respect for congestion management in short-term and long-term intervals. It is attempted in the present paper to investigate the impact mechanism of FACTS devices and demand response programs together with generation re-dispatch as s...
متن کاملProductivity Management in Iranian Railway by Data Envelopment Analysis
Study of various transportation indicators could be an appropriate criterion in evaluating the performance of the existing railways throughout the globe. This study was carried out to investigate the performance of rolling stock of Iranian railway using productivity analysis. In order to solve the problems, some solutions were provided by productivity management cycle steps. At the first step, ...
متن کاملOptimal Placement of Substations Based on Economic and Technical Risk Management
Design and expansion of distribution systems seems inevitable in view of the need to satisfy the rise in energy consumption in a technical and economical way. Optimal location, sizing and determining the service area of substations is one of the principle problems in expansion of distribution systems. Also uncertainty is one of the important factors that increase risk of exact decision makings....
متن کاملAnalysis of interactions among barriers in project risk management
In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success...
متن کامل