Optimisation of PM scheduling for multi-component systems - a simulated annealing approach

نویسندگان

  • Mohammad Doostparast
  • Farhad Kolahan
  • Mahdi Doostparast
چکیده

Optimisation of PM scheduling for multi-component systems – a simulated annealing approach Mohammad Doostparast a , Farhad Kolahan b & Mahdi Doostparast c a Iranian Oil Pipeline and Telecommunication Company (IOPTC) , Tehran , Iran b Department of Mechanical Engineering , Ferdowsi University of Mashhad , Mashhad , Iran c Department of Statistics, School of Mathematical Sciences , Ferdowsi University of Mashhad , Mashhad , Iran Published online: 12 Jul 2013.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

تعیین نوع و زمانبندی بهینه نگهداری و تعمیرات پیشگیرانه سیستمهای چند‌جزیی بر اساس قابلیت اطمینان

In this research, a model for optimal PM planning based on reliability is developed and solved for multi-component systems. In the proposed model, the type of PM actions for each inspection period is determined in such manner that the total weighted related costs are minimized while a minimum required system reliability is maintained. The planning horizon is divided into some inspections interv...

متن کامل

An algorithm for multi-objective job shop scheduling problem

Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...

متن کامل

َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

متن کامل

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

متن کامل

A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations

In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Int. J. Systems Science

دوره 46  شماره 

صفحات  -

تاریخ انتشار 2015