Innovative Planning in-Service Inspections of Fatigued Structures Under Parametric Uncertainty of Lifetime Models

نویسندگان

  • Nicholas A. Nechval
  • Vadims Danovics
  • Natalija Ribakova
چکیده

The main aim of this paper is to present more accurate stochastic fatigue models for solving the fatigue reliability problems, which are attractively simple and easy to apply in practice for situations where it is difficult to quantify the costs associated with inspections and undetected cracks. From an engineering standpoint the fatigue life of a structure consists of two periods: (i) crack initiation period, which starts with the first load cycle and ends when a technically detectable crack is presented, and (ii) crack propagation period, which starts with a technically detectable crack and ends when the remaining cross section can no longer withstand the loads applied and fails statically. Periodic inspections of fatigued structures, which are common practice in order to maintain their reliability above a desired minimum level, are based on the conditional reliability of the fatigued structure. During the period of crack initiation, when the parameters of the underlying lifetime distributions are not assumed to be known, for effective in-service inspection planning (with decreasing intervals as alternative to constant intervals often used in practice for convenience in operation), the pivotal quantity averaging (PQA) approach is offered. During the period of crack propagation (when the damage tolerance situation is used), the approach, based on an innovative crack growth equation, to in-service inspection planning (with decreasing intervals between sequential inspections) is proposed to construct more accurate reliability-based inspection strategy in this case. To illustrate the suggested approaches, the numerical examples are given.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty

In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied.  The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...

متن کامل

Parametric Study of SCFs in Unstiffened Gap Tubular KT-joints of Offshore Structures under OPB Moment Loading

In this paper, results extracted from a set of stress analyses performed on 46 FE models for unstiffened gap tubular KT-joints are presented and discussed. The main objective of the FE analyses, validated against experimental data, was to run a parametric investigation on the effects of geometrical characteristics of the joint on the values of the stress concentration factors (SCFs). The SCF is...

متن کامل

Parametric Study of Qutrigger Braced and Belt System in Tall Building Structures

Current innovative lateral load carrying systems for tall buildings are those in which the lateral drift is limited to an allowable value without considerable influence on economy. This aim is achieved by using special systems capable of using maximum stiffness and strength capacity of individual structural elements. An effective structural solution in this respect is the use of outrigger brace...

متن کامل

An innovative algorithm for planning and scheduling healthcare units with the aim of reducing the length of stay for patients (Case study: Cardiac SurgeryWard of Razavi Hospital of Mashhad)

One of the key applications of operational research in health systems management is to improve the mechanism of resource allocation and program planning in order to increase the system efficiency. This study seeks to offer an innovative method for the planning and scheduling of health service units with the aim of reducing the patients' Length of Stay (LOS) in the Cardiac Surgery Ward of Razavi...

متن کامل

A Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach

The production planning is an important problem in most of manufacturing systems in practice. Unlike many researches existing in literature, this problem encounters with great uncertainties in parameters and input data. In this paper, a single machine capacitated production planning problem is considered and a linear programming formulation is presented. The production costs are assumed to be u...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016