Multi-criteria scheduling: an agent-based approach for expert knowledge integration
نویسندگان
چکیده
In this work, we present an agent-based approach to multi-criteria combinatorial optimization. It allows to flexibly combine elementary heuristics that may be optimal for corresponding single-criterion problems. In the multi-criteria case a smart combination of such heuristics is supposed to efficiently approximate the whole Pareto-front of non-dominated trade-off solutions. We optimize an instance of the scheduling problem 1|d j|∑C j,Lmax and show that the modular building block architecture of our optimization model and the distribution of acting entities enable beneficial integration of problem specific expert knowledge. We present a universal mutation operator for combinatorial problem encodings that allows to construct certain solution strategies, such as advantageous sorting or known optimal sequencing procedures. In this way, it becomes possible to derive more complex heuristics from atomic local heuristics that are known to tackle fractions of the complete problem. We show that it is possible to approximate both single-criterion problems such as Pm|d j|∑U j as well as more challenging multi-criteria scheduling problems, like Pm||Cmax,∑C j and Pm|d j|Cmax,∑C j,∑U j. Christian Grimme · Uwe Schwiegelshohn TU Dortmund University, Robotics Research Institute, Otto-Hahn-Strasse 8, 44227 Dortmund, Germany Tel.: +49-231-2634 Fax: +49-231-3251 E-mail: {firstname.lastname}@udo.edu Joachim Lepping Laboratoire d’Informatique de Grenoble ENSIMAG antenne de Montbonnot ZIRST 51, avenue Jean Kuntzmann 38330 Montbonnot Saint Martin, FRANCE Tel.: +33-476-6120-69 Fax: +33-476-6120-99 E-mail: [email protected]
منابع مشابه
A Hybrid Modeling for Continuous Casting Scheduling Problem
This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...
متن کاملA multi Agent System Based on Modified Shifting Bottleneck and Search Techniques for Job Shop Scheduling Problems
This paper presents a multi agent system for the job shop scheduling problems. The proposed system consists of initial scheduling agent, search agents, and schedule management agent. In initial scheduling agent, a modified Shifting Bottleneck is proposed. That is, an effective heuristic approach and can generate a good solution in a low computational effort. In search agents, a hybrid search ap...
متن کاملDynamic configuration and collaborative scheduling in supply chains based on scalable multi-agent architecture
Due to diversified and frequently changing demands from customers, technological advances and global competition, manufacturers rely on collaboration with their business partners to share costs, risks and expertise. How to take advantage of advancement of technologies to effectively support operations and create competitive advantage is critical for manufacturers to survive. To respond to these...
متن کاملA knowledge-based NSGA-II approach for scheduling in virtual manufacturing cells
This paper considers the job scheduling problem in virtual manufacturing cells (VMCs) with the goal of minimizing two objectives namely, makespan and total travelling distance. To solve this problem two algorithms are proposed: traditional non-dominated sorting genetic algorithm (NSGA-II) and knowledge-based non-dominated sorting genetic algorithm (KBNSGA-II). The difference between these algor...
متن کاملAn algorithm for multi-objective job shop scheduling problem
Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Scheduling
دوره 16 شماره
صفحات -
تاریخ انتشار 2013