End Date Actual Start Date Actual End Date Define 5
نویسنده
چکیده
Manufacturing performances tend to produce defects due to various reasons which can be improved by identifying and eliminating them using six sigma. In the present work, DMAIC (Define, Measure, Analyze, Improve and Control) has been used to reduce the number of vehicle engine rejection. In define phase problem was defined by selecting the core issues concerned. In the measure phase data was collected to determine the current performance and the process capability. During Analyzing phase root causes of engine rejection were identified. In the improvement phase solutions were arrived at and finally in the control phase various tools were implemented for tracking the process and putting it under control. The study reports process quality improvement through reduction in defects, from 7243 ppm to 687 ppm. Cost of poor quality (COPQ) has been significantly reduced from $ 30, 000 to $ 9, 000 per annum, a reduction of 333%.
منابع مشابه
تعیین موعد مقرر تحویل پروژه در شبکه های پرت پویا با چندین خدمت دهنده
In this paper, multi-class dynamic PERT network is considered as a queueing network, where the projects are similar and new projects are generated according to a Poisson process. Each activity is performed independently in its corresponding service station with exponential distribution by one server from several servers settled in service station based on FCFS (Fist Come, First Served) discipli...
متن کاملEffects of Harvest Date on Apple Fruit Quality at Harvesting and after Cold Storage
Different dates for apples fruit harvest (Malus domestica Borkh. Cv. Fuji) were studied to determine physiochemical changes during the storage. Fuji apples were harvested from 9 September till 23 October, at five different times and stored at 0±0.5 °C and 95% relative humidity for 120 days. To determine the best harvest date for maximum quality and storability, physical and chemical paramet...
متن کاملRobLog Cognitive Robot for Automation of Logistic Processes
Call Identifier: FP7-ICT-2009-6 Objectives: Cognitive Systems and Robotics 2.1 Work package: 2 Delivery date (project month): 30 Nature: D Deliverable due date: August 02, 2012 Actual submission date: January 15, 2012 Deliverable new due date: July 31, 2012 Actual submission date: July 31, 2012 Start date of project: February 02, 2011 Duration: 36 months Lead contractor for this deliverable: UN...
متن کاملتعیین دقت سونوگرافی و قانون نیگل در تخمین زمان زایمان
The Accuracy Determination of the Naegele’s Rule and Sonography for Estimating the Delivery Date R. Dehghani Firouzabadi MD , T. Botorabi , N. Tayebi GP Received: 23/09/06 Sent for Revision: 27/02/07 Received Revised Manuscript: 09/07/07 Accepted: 08/09/07 Background and Objective: Estimation of the gestational age (G.A) and the estimated date of confinement (EDC) are of paramount important fac...
متن کاملClimatic Zonation Planting Sunflower Cultivation in Kurdistan Province
In the current investigation, evaporation and transpiration potential were also estimated by means of FAO Penman- Monteith evapotranspiration estimation method and Deviation from Optimum Percentage (DOP) technique by climatic elements (min-max temperature, relative humidity, wind speed and radiation) during at least 10 years statistical period regarding sunflower phenological conditions in Kurd...
متن کامل