Analysis on flood generation processes by means of a continuous simulation model
نویسندگان
چکیده
In the present research, we exploited a continuous hydrological simulation to investigate on key variables responsible of flood peak formation. With this purpose, a distributed hydrological model (DREAM) is used in cascade with a rainfall generator (IRP-Iterated Random Pulse) to simulate a large number of extreme events providing insight into the main controls of flood generation mechanisms. Investigated variables are those used in theoretically derived probability distribution of floods based on the concept of partial contributing area (e.g. Iacobellis and Fiorentino, 2000). The continuous simulation model is used to investigate on the hydrological losses occurring during extreme events, the variability of the source area contributing to the flood peak and its lag-time. Results suggest interesting simplification for the theoretical probability distribution of floods according to the different climatic and geomorfologic environments. The study is applied to two basins located in Southern Italy with different climatic characteristics.
منابع مشابه
Analysis of Flood Hydraulic in Alluvial Fan River using CCHE2D Case Study: (Roodan River)
In this study the advantages and importance of a numerical model to predict and monitor the processes governing hydraulic changes alluvial fan river is discussed. For this reason and because of the importance of flow velocity and shear stresses resulting from the erosion of the river, A two-dimensional numerical model to simulate the CCHE2D river changes ranging from Roodan River is used. In th...
متن کاملEstimation of Design Floods Using Continuous Simulation
A common problem encountered by catchment managers is the estimation of design peak flow quantiles. Current practice, as discussed by Pilgrim (1987), is based either on the use of statistical approaches such as an at-site flood frequency analysis, or the use of a catchment modelling system to simulate catchment response to design rainfall. For many practical problems, the option of an at-site f...
متن کاملTwo-Dimetional Hydraulic Simulation of Floods using the LISFLOOD-FP Raster Model (A Case Study: The Shemshak Watershed, Tehran Province)
LISFLOOD-FP belongs to a new generation of hydrodynamic models of flood simulation, which is implemented by a digital elevation map for the river and the waterways, route information and flow rates The LISFLOOD-FP features are two-dimensional hydraulic models: 1. based on raster 2. large scale 3. ease of formulation and high computational efficiency 4. simplicity of use 5. spatial adjustmen...
متن کاملEffects of impervious surfaces and urban development on runoff generation and flood hazard in the Hajighoshan watershed
Urbanization is a pervasive global trend. The development of residential areas and road network in Hajighoshan watershed (northern Iran) has been observed in the recent several decades. The objective of this study is the quantitative investigation of the effects of impervious surfaces development and urban development on runoff generation and flood hazard. The study of urban area development wa...
متن کاملComparison of classic and fuzzy analytic hierarchy processes for mapping the flood hazard of Birjand plain
Flood is one of the most destructive natural hazards which impose vast costs in order to compensate its effects, especially in areas where there are manifestations of human development (such as cities). Urban development, particularly in the margins of rivers, has increased flood damages in recent decades. The aim of this study was to develop flood hazard maps of Birjand plain based on analyses...
متن کامل