Risk management in small construction projects

نویسندگان

  • Kajsa Simu
  • Ingegerd Simonsson
چکیده

Risks and other uncertainties can cause losses, which lead to increasing costs and time delays,both during the project and at the end. The need to prevent failures during the constructionprocess and other losses related to construction has been emphasised in various reports.Example consequences are failure costs in civil works which can be close to 8% of the totalbudget for projects – more than 60% of these are costs due to ‘self-inflicted’ uncertainty.However, this paper is focused on small sized construction projects (in the range 1-15 MSEK),which are dominant in the Swedish construction sector today. They account for 83% of the totalnumber of projects. The aim of this paper is to describe how risks and uncertainties are managed in small sizedconstruction projects. Some characteristics of these projects are presented, for example theirorganisation, financial size and type of contract undertaken. The paper identifies and describesthe ways in which risk analyses are performed on a number of small projects today and wherethe common risks are believed to lie. The study is based on interviews with personnel selectedfrom a number of construction companies. In order to be able to make improvements in theconstruction sector, a clear focus on uncertainties, which means both opportunities as well asrisks, is needed. Organisations working mainly on small projects, that wish to improve theirperformance, need systematic methods for managing risks. Small sized construction projects are found to be managed both intuitively, i.e. based onexperience and systematically, i.e. using methodologies for risk and uncertainty management.The systems are, however, developed with the intention of fitting all sizes of projects and notspecifically small sized projects. Some common risk sources in these projects are contractdocumentation and tight schedules, the client, individual planning and logistics, cost estimatesused to compile the tender, subcontractors, technical solutions, safety of third parties andweather.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Safety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S

Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...

متن کامل

A Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal

   This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...

متن کامل

Path analysis of occupational injuries based on the structural equation modeling approach: a retrospective study in the construction industry

Background and aims: The construction industry, sites, and projects are the most dangerous industries in terms of the risk of occupational accidents and injuries. Important factors that have led the industry as a health, safety, environment (HSE) high-risk industry in the world can be cited such as continuous changes in construction projects, using a lot of resources, poor working conditions,...

متن کامل

Analysis of interactions among barriers in project risk management

In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006