Based on a particular case study, this paper presents two approaches to buffer management under demand uncertainty, which is characterized by high lumpiness, dispersion and volatility. The common theme of both of the two approaches is not to find an advanced statistical method to improve demand forecast on the basis of historical data. Rather, these approaches provide new business paradigms to deal with demand uncertainty. The first approach, make-to-anticipated-order (MTAO), takes advantage of the mechanism of make-to-order (MTO) and develops a process that the production is pulled by anticipated orders instead of being pushed by the forecast of unpredictable future demand. The implementation of this method, on one hand, breaks through the precondition of MTO that the total production cycle time should be less than customers' desired lead-time. On the other hand, MTAO enjoys the advantage of arranging production by responding to customer demand to reduce inventory costs and obsolescence risks of MPS level items. The second approach makes use of postponement and commonality strategy to lower demand uncertainty. The basic principle is that aggregate demand is more stable than disaggregate demand. Thus, if a common module instead of various individual modules in a module family acts as a MPS item, the demand of the common module will represent the aggregate demand of all individual modules in the module family and more accurate forecast can be made. Then by using the forecasted demand distribution of the common module, we can figure out optimized multistage inventory placement to buffer demand uncertainty with the minimum holding cost of total safety stock. In effect, by implementing postponement and commonality strategy, we change the push-pull boundary and leave more demand uncertainty to the pull part of the system. Thesis Supervisor: Christopher Caplice
منابع مشابه
Optimal flexible capacity in newsboy problem under stochastic demand and lead-time
In this paper, we consider a newsvendor who is going to invest on dedicated or flexible capacity, our goal is to find the optimal investment policy to maximize total profit while the newsvendor faces uncertainty in lead time and demand simultaneously. As highlighted in literature, demand is stochastic, while lead time is constant. However, in reality lead time uncertainty decreases newsvendor's...
متن کاملOptimization of two-stage production/inventory systems under order base stock policy with advance demand information
It is important to share demand information among the members in supply chains. In recent years, production and inventory systems with advance demand information (ADI) have been discussed, where advance demand information means the information of demand which the decision maker obtains before the corresponding actual demand arrives. Appropriate production and inventory control using demand info...
متن کاملAnalysis of two production inventory systems with buffer, retrials and different production rates
This paper considers the comparison of two ðs; SÞ production inventory systems with retrials of unsatisfied customers. The time for producing and adding each item to the inventory is exponentially distributed with rate b. However, a production rate ab higher than b is used at the beginning of the production. The higher production rate will reduce customers’ loss when inventory level appro...
متن کاملIntegrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty
In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied. The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...
متن کاملTransmission Congestion Management Considering Uncertainty of Demand Response Resources’ Participation
Under the smart grid environment, demand response resources (DRRs) are introduced as a virtual power plant to enhance power system adequacy. DRRs often fail to reduce their load due to some external factors. In this paper, a reliability model of a DRR is constructed as multi-state conventional generation units, where the probability, frequency of occurrence, and departure rate of each state can...