Improved particle swarm optimization to minimize periodic preventive maintenance cost for series-parallel systems
نویسندگان
چکیده
This study minimizes the periodic preventive maintenance cost for a series-parallel system using an improved particle swam optimization (IPSO). The optimal maintenance periods for all components in the system are determined efficiently. Though having advantages such as simple understanding and easy operation, a typical particle swam optimization (PSO) is easily trapped in local solutions when optimizing complex problems and yields inferior solutions. The proposed IPSO considers maintainable properties of a series-parallel system. The importance measure of components is utilized to evaluate the effects of components on system reliability when maintaining a component. Accordingly, the important components form superior initial particles. Furthermore, an adjustment mechanism is developed to deal with the problem in which particles move into an infeasible area. A replacement mechanism is implemented that replaces the first n particles ranked in descending order of total maintenance cost with randomly generated particles in the feasible area. The purpose of doing so is overcome the weakness in that a typical PSO is easily trapped in local solutions when optimizing a complex problem. An elitist strategy is also applied within the IPSO. Additionally, this study employs response surface methodology (RSM) via systematic parameters experiments to determine the optimal settings of IPSO parameters. Finally, a case demonstrates the effectiveness of the proposed IPSO in optimizing the periodic preventive maintenance model for series-parallel systems. 2011 Elsevier Ltd. All rights reserved.
منابع مشابه
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملPeriodic flexible maintenance planning in a single-machine production environment
Preventive maintenance is the essential part of many maintenance plans. From the production point of view, the flexibility of the maintenance intervals enhances the manufacturing efficiency. On the contrary, the maintenance departments tend to know the timing of the long term maintenance plans as certain as possible. In a single-machine production environment, this paper proposes a simulation–o...
متن کاملOptimization of grid independent diesel-based hybrid system for power generation using improved particle swarm optimization algorithm
The power supply of remote sites and applications at minimal cost and with low emissions is an important issue when discussing future energy concepts. This paper presents modeling and optimization of a photovoltaic (PV)/wind/diesel system with batteries storage for electrification to an off-grid remote area located in Rafsanjan, Iran. For this location, different hybrid systems are studied and ...
متن کاملJIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملImproved Genetic Algorithm for Minimizing Periodic Preventive Maintenance Costs in Series-Parallel Systems
This work presents an improved genetic algorithm (IGA) for minimizing periodic preventive maintenance costs in series-parallel systems. The intrinsic properties of a repairable system, including the structure of reliability block diagrams and component maintenance priorities are considered by the proposed IGA. The proposed component importance measure considers these properties, identifies key ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Expert Syst. Appl.
دوره 38 شماره
صفحات -
تاریخ انتشار 2011