Optimal Control of Unreliable Production/Inventory Systems with Expediting

نویسندگان

  • Yan Jia
  • Ratna Babu Chinnam
چکیده

In this paper, we study an unreliable multi-product production/inventory system consisting of N production machines and an assembly machine. The final products are assembled-to-order whereas components are built at N separate production machines on a make-to-stock routine. The objective of our study is to develop an integrated optimal control policy that minimizes the total long-run average cost of production, expediting, inventory, preventive maintenance and repair. We present a three-critical-limit policy that addresses the production/expediting/inventory and preventive maintenance controls in an integrated manner. Furthermore, we propose a simulation based experimental design scheme based on response surface methodology to optimize the parameters of the policy. Finally, we provide an illustrative numerical example.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Note: A Separation Principle for a Class of Assemble-to-Order Systems with Expediting

In an assemble-to-order system, a wide variety of products are rapidly assembled from component inventories in response to customer orders. We assume that orders must be filled within a product-specific target lead time. In the event that some of the components required to fill an order are out of stock, these components must be expedited. The objective is to minimize the expected infinite-hori...

متن کامل

Inventory Control with Generalized Expediting

We consider a single-item, periodic review inventory control problem where discrete stochastic demand must be satisfied. When shortages occur, the unmet demand must be filled by some form of expediting. We allow a very general form for the cost structure of expediting, including the special case of lost sales. Examples of expediting are overtime production, where production is allowed above and...

متن کامل

Supply Chain Management with Guaranteed Delivery

We consider a two-stage supply chain under centralized control. The downstream facility faces discrete stochastic demand and passes supply requests to the upstream facility. The upstream facility always meets the supply requests from downstream. If the upstream facility cannot meet the supply requests from inventory on hand, the shortage must be filled by expediting, which will incur per unit a...

متن کامل

Optimization of two-stage production/inventory systems under order base stock policy with advance demand information

It is important to share demand information among the members in supply chains. In recent years, production and inventory systems with advance demand information (ADI) have been discussed, where advance demand information means the information of demand which the decision maker obtains before the corresponding actual demand arrives. Appropriate production and inventory control using demand info...

متن کامل

Determination of optimum of production rate of network failure prone manufacturing systems with perishable items using discrete event simulation and Taguchi design of experiment

This paper, considers Network Failure Manufacturing System (NFPMS) and production control policy of unreliable multi-machines, multi-products with perishable items. The production control policy is based on the Hedging Point Policy (HPP). The important point in the simulation of this system is assumed that the customers who receive perishable item are placed in priority queue of the customers w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006