Stochastic Sequencing with Job Families , Setup Times , and Due

نویسندگان

  • Mark P. Van Oyen
  • Izak Duenyas
  • Chi-Yang Tsai
چکیده

We consider the problem of allocating a single server to families of jobs with random service times and due dates. Furthermore, a setup is required when the server switches from one job family to another. We address the problems of minimizing expected weighted ow time, expected maximum lateness, and total weighted tardiness with emphasis on problems for which it is assumed that each family can be set up only once (the Group Technology assumption). We derive conditions under which simple sequencing rules are optimal for each of these problems with group technology.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

Start Project Y43-mat Combinatorial Approximation Algorithms Minimizing the Number of Tardy Jobs on a Single Machine with Batch Setup times Minimizing the Number of Tardy Jobs on a Single Machine with Batch Setup Times

This paper investigates a single-machine sequencing problem where the jobs are divided into families, and where a setup time is incurred whenever there is a switch from a job in one family to a job in another family. This setup only depends on the family of the job next to come and hence is sequence independent. The jobs are due-dated, and the objective is to nd a sequence of jobs that minimize...

متن کامل

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

A Job Shop Scheduling Problem with Sequence-Dependent Setup Times Considering Position-Based Learning Effects and Availability Constraints

 Sequence dependent set-up times scheduling problems (SDSTs), availability constraint and transportation times are interesting and important issues in production management, which are often addressed separately. In this paper, the SDSTs job shop scheduling problem with position-based learning effects, job-dependent transportation times and multiple preventive maintenance activities is studied. ...

متن کامل

Dynamic Programming Approach to a Two Machine Flow Shop Sequencing with Two-Step-Prior-Job Dependent Setup Times

The purpose of this study is to develop an effective scheduling methodology for a realistic flow shop sequencing problem. The flow shop consists of two machines where only the first machine has separable, external, and sequence dependent setup times. The length of setup times required for a job depends not on the immediately preceding job but on the job which is two steps prior to it. The probl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1995