Dynoraii: a Real-Time Planning Algorithm

نویسندگان

  • Babak Hamidzadeh
  • Shashi Shekhar
چکیده

There has been a recent rise in research on real-time planning algorithms. Most of these algorithms address either the issue of response-time constraints or the issue of dynamic environments. We propose a new real-time planning algorithm, DYNORAII, to address both of these issues simultaneously. DYNORAII is structured as a sequence of ‘‘partial planning and execution’’ cycles to avoid obsolescence of planned solutions at the time of execution. DYNORAII uses a stopping criterion to balance planning cost and execution cost to achieve near optimal response times. DYNORAII was used for the routing problem to optimize total cost in both static and dynamic environments. It shows better average-case time complexity than traditional realtime algorithms.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

eal-Time Search Algorit

A real-time AI problem solver performs a task or a set of tasks in two phases: planning and execution. Under real-time constraints, a real-time AI problem solver must balance the planning and the execution phases of its operation to comply with deadlines. This paper provides a methodology for specification and analysis of real-time AI problems and problem solvers. This methodology is demonstrat...

متن کامل

Specification and Analysis of Real-time Problem Solvers

There has been a recent rise in research on real-time problem solving algorithms in artificial intelligence (AI). A real-time AI problem solver performs a task or a set of tasks in two phases. During the first phase, the problem solver searches for a solution that, once executed, will satisfy the requirements of the task. We refer to this phase as the planning phase or the search phase. During ...

متن کامل

A New Multi-objective Model for Multi-mode Project Planning with Risk

The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...

متن کامل

Meta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain

In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...

متن کامل

Designing an integrated production/distribution and inventory planning model of fixed-life perishable products

This paper aims to investigate the integrated production/distribution and inventory planning for perishable products with fixed life time in the constant condition of storage throughout a two-echelon supply chain by integrating producers and distributors. This problem arises from real environment in which multi-plant with multi-function lines produce multi-perishable products with fixed life ti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • International Journal on Artificial Intelligence Tools

دوره 2  شماره 

صفحات  -

تاریخ انتشار 1993