Long-term Planning versus Short-term Planning in the Asymptotical Location Problem

نویسندگان

  • A. BRANCOLINI
  • G. BUTTAZZO
  • F. SANTAMBROGIO
  • E. STEPANOV
چکیده

Given the probability measure ν over the given region Ω ⊂ Rn, we consider the optimal location of a set Σ composed by n points Ω in order to minimize the average distance Σ 7→ R Ω dist (x,Σ) dν (the classical optimal facility location problem). The paper compares two strategies to find optimal configurations: the long-term one which consists in placing all n points at once in an optimal position, and the short-term one which consists in placing the points one by one adding at each step at most one point and preserving the configuration built at previous steps. We show that the respective optimization problems exhibit qualitatively different asymptotic behavior as n → ∞, although the optimization costs in both cases have the same asymptotic orders of vanishing.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty

Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...

متن کامل

Long-term Planning of Optimal Placement of Distribution Transformers to Improve Reliability and Power Quality with the Approach of Reducing Costs and Losses

One of the most critical and complex issues in long-term planning of distribution networks is the optimal placement of distribution transformers. In this paper, the optimal placement of distribution transformers was investigated based on a complete and multi-objective function. In the proposed method, location, optimal capacity, and the service area are determined by minimizing costs (investmen...

متن کامل

Considering Pricing Problem in a Dynamic and Integrated Design of Sustainable Closed-loop Supply Chain Network

Flexible and dynamic supply chain network design problem has been studied by many researchers during past years. Since integration of short-term and long-term decisions in strategic planning leads to more reliable plans, in this paper a multi-objective model for a sustainable closed-loop supply chain network design problem is proposed. The planning horizon of this model contains multiple strate...

متن کامل

Analysis of oil price behavior in the short term and long term based on the strategy of producers

The strategy are in the planning of oil price changes in the short and long term. Therefore, producers should seek to analyze the behavior of crude oil prices in the short and long term in order to adjust their plans. the price level in the oil market is associated with high fluctuations, many producers in the market seek to reduce exchange risk. This article aims to analyze the behavior of oil...

متن کامل

یکپارچه سازی برنامه‌ریزی و زمانبندی تولید در صنایع فرآیندی چند محصولی با سیستم تولیدی پیوسته

  One of the main elements of each supply chain is production. Production planning in multi-products process industries in which products are subjected to the complicated operational constraints is a very hard work because production of computed optimal volume should be compatible with operation scheduling constraints of production system. Thus, integration idea has been proposed for required d...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008