A fast heuristic for large-scale assembly job shop scheduling problems with bill of materials

نویسندگان

  • GIANPAOLO GHIANI
  • ANTONIO GRIECO
  • ANTONIO GUERRIERI
  • ANDREA MANNI
  • EMANUELE MANNI
چکیده

In this paper, we study an assembly job shop scheduling problem with tree-structured precedence constraints and jobs characterized by specific bills of materials. We propose a fast and efficient constructive heuristic that is able to easily deal with real-world sized instances. The production schedule takes into account the actual availability of materials in stock as well as the supply times and the capacity constraints, with the goal to minimize the average delay with respect to the due dates associated to the customers’ orders. Computational results on data related to real-life instances show that our approach is able to solve efficiently very large problems. Moreover, the proposed heuristic turns out to be scalable as the instance size grows. Key–Words: Assembly job shop, Bill of materials, Operations scheduling, Heuristics

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Large-scale assembly job shop scheduling problems with bill of materials: models and algorithms

In this paper, we study an assembly job shop scheduling problem with tree-structured precedence constraints and jobs characterized by specific bills of materials. We propose a mathematical model to deal with a simplified version of the problem, as well as a fast and efficient constructive heuristic that is able to easily face real-world-sized instances. The production schedule takes into accoun...

متن کامل

Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines

In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

Train Scheduling Problem with Consideration of Praying Constraint as an Application of Job Shop Scheduling Problem

The present paper extends the idea of job shop scheduling problem with resting constraints to the train scheduling problem with the Muslim praying considerations. For this purpose, after proposing the new mathematical model, a heuristic algorithm based on the Electromagnetism-Like algorithm (EM) which is well adjusted to scheduling problems is employed to solve the large-size practical cases. T...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015