Using Chronological Splitting to Compare Cross- and Single-company Effort Models: Further Investigation
نویسندگان
چکیده
Numerous studies have used historical datasets to build and validate models for estimating software development effort. Very few used a chronological split (where projects’ end dates are used so that training sets only contain projects that were completed before the start date of each project in the validation set), and only one compared chronological split to random split. Therefore the aim of this study is to investigate further and compare the use of chronological and random splitting. We do so in the context of comparing cross-company and singlecompany models for effort estimation. We used 450 single-company projects and 741 cross-company projects from the ISBSG Release 10 repository, and estimates were obtained using manual stepwise regression. We found that with these data the use of chronological splitting, and different splitting dates, did not affect prediction accuracy. We were not able to obtain a converging set of findings when comparing crossto single-company predictions given that different accuracy measures presented contradictory results.
منابع مشابه
Investigating the Use of Chronological Splitting to Compare Software Cross-company and Single-company Effort Predictions: A Replicated Study
CONTEXT: Three previous studies have investigated the use of chronological split to compare crossto single-company effort predictions, where all used the ISBSG dataset release 10. Therefore there is a need for these studies to be replicated using different datasets such that the patterns previously observed can be compared and contrasted, and a better understanding with regard to the use of chr...
متن کاملInvestigating the Use of Chronological Splitting to Compare Software Cross-company and Single-company Effort Predictions
CONTEXT: Numerous studies have investigated the use of cross-company datasets to estimate effort for single-company projects; however to date only one has compared the effect of using a chronological split instead of a random split to assign projects to a training set and a validation set, finding no significant differences. OBJECTIVE: The aim of this study is to extend [15] using a project-by-...
متن کاملNumerical Investigation on Compressible Flow Characteristics in Axial Compressors Using a Multi Block Finite Volume Scheme
An unsteady two-dimensional numerical investigation was performed on the viscous flow passing through a multi-blade cascade. A Cartesian finite-volume approach was employed and it was linked to Van-Leer's and Roe's flux splitting schemes to evaluate inviscid flux terms. To prevent the oscillatory behavior of numerical results and to increase the accuracy, Monotonic Upstream Scheme for Conservat...
متن کاملIntegrated JIT Lot-Splitting Model with Setup Time Reduction for Different Delivery Policy using PSO Algorithm
This article develops an integrated JIT lot-splitting model for a single supplier and a single buyer. In this model we consider reduction of setup time, and the optimal lot size are obtained due to reduced setup time in the context of joint optimization for both buyer and supplier, under deterministic condition with a single product. Two cases are discussed: Single Delivery (SD) case, and Multi...
متن کاملPrevalence of Low Bone Mass for Chronological Age in Children with Acute Leukemia in Southern Iran
Background: Total bone mass acquired during childhood is known to be the most important determinant and base of lifelong skeletal health. The present study investigated the prevalence of low bone mass for chronological age (LBM) in lumbar and femoral areas of leukemic children in the south of Iran and evaluated the association of anthropometric, clinical and laboratory data of these children ...
متن کامل