Lhc Beam Stability and Performance of the Q/q’ Diagnostic Instrumentation

نویسندگان

  • R. J. Steinhagen
  • A. Boccardi
  • M. Gasior
چکیده

The BBQ tune (Q) and chromaticity (Q’) diagnostic systems played a crucial role during the LHC commissioning while establishing circulating beam and first ramps. Early on, they allowed to identify issues such as residual tune stability, beam spectrum interferences and beam-beam effects – all of which may impact beam life-times and thus are being addressed in view of nominal LHC operation. This contribution discusses the initial beam stability in relation to the achieved instrumentation sensitivity, corresponding tune frequency and Q’ resolution.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Mini/Micro-Grid Adaptive Voltage and Frequency Stability Enhancement Using Q-learning Mechanism

This paper develops an adaptive control method for controlling frequency and voltage of an islanded mini/micro grid (M/µG) using reinforcement learning method. Reinforcement learning (RL) is one of the branches of the machine learning, which is the main solution method of Markov decision process (MDPs). Among the several solution methods of RL, the Q-learning method is used for solving RL in th...

متن کامل

Beam Instrumentation and Diagnostics for the LHC Upgrade

The extensive array of beam instrumentation with which the LHC is equipped, has played a major role in its commissioning, rapid intensity ramp-up and safe and reliable operation. High Luminosity LHC (HL-LHC) brings with it a number of new challenges in terms of beam instrumentation that will be discussed in this chapter. The beam loss system will need significant upgrades in order to be able to...

متن کامل

Constructing and Validating a Q-Matrix for Cognitive Diagnostic Analysis of a Reading Comprehension Test Battery

Of paramount importance in the study of cognitive diagnostic assessment (CDA) is the absence of tests developed for small-scale diagnostic purposes. Currently, much of the research carried out has been mainly on large-scale tests, e.g., TOEFL, MELAB, IELTS, etc. Even so, formative language assessment with a focus on informing instruction and engaging in identification of student’s strengths and...

متن کامل

Commissioning and First Performance of the Lhc Beam Instrumentation

This paper will outline the progress with LHC commissioning to date, detailing the performance achieved with all the main LHC beam instrumentation systems. It will include an overview of the beam loss system and its role in machine protection, along with that of the beam position system and its use for automatic orbit control. Results will be shown from the highly sensitive base band tune syste...

متن کامل

Initial Results from Beam Commissioning of the Lhc Beam Dump System

Initial commissioning of the LHC beam dump system with beam took place in August and September 2008. The preparation, setting-up and the tests performed are described together with results of the extractions of beam into the dump lines. Analysis of the first detailed aperture measurements of the extraction channels and kicker performance derived from dilution sweep shapes are presented. The per...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010