Simulation study for the optimal repair capacity of an IT maintenance center based on LRD failure distribution

نویسندگان

  • So Young Sohn
  • Ki Yeol Oh
چکیده

Consider various host systems that consist of both hardware and software. There is an IT center which governs the activities of all of those host systems including the reported failures. The center's major concern is deciding the proper level of repair capacity for various kinds of failures due to hardware, software, and operator related problems where corresponding failure and repair times may exhibit fairly large variations. In this paper, we use Monte Carlo simulation in order to decide the optimal repair capacity when both failures and repair times of individual host systems exhibit long range dependent (LRD) property. In terms of both utilization rate and the maximum waiting time, we suggest optimal capacity. Various sensitivity analyses follow.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Maintenance Cost Analysis for Replacement Model with Perfect Minimal Repair

With the evolution of technology, the maintenance of sophisticated systems is of concern for system engineers and system designers. The maintenance cost of the system depends in general on the replacement and repair policies. The system replacement may be in a strictly periodic fashion or on a random basis depending upon the maintenance policy. At failure, the repair of the system may be perfor...

متن کامل

Optimal overhaul–replacement policy for a multi-degraded repairable system sold with warranty

In this research, we study an optimal overhaul–replacement policy of a multi-degraded repairable system sold with a free replacement warranty. In the proposed replacement policy, a maintenance action and failure are dependent on a system degradation level and the system age, and hence the replacement model will provide more effective maintenance decisions. Failure of the system is modeled using...

متن کامل

Optimal Estimation of Weibull Distribution Parameters in order to Provide Preventive-Corrective Maintenance Program for Power Transformers

In this paper, a new method for modelling and estimation of reliability parameters of power transformer components in distribution and transmission voltage levels for preventive-corrective maintenance schedule of transformers is proposed. In this method, with optimal estimation of Weibull distribution parameters using least squares method and input data uncertainty reduction, failure rate and p...

متن کامل

Reliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants

  Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...

متن کامل

Two echelon-two indenture extended warranty distribution network under imperfect preventive maintenance policies

Nowadays, offering extended warranty is considered as a lucrative source of income from the perspective of the after-sale service providers. Meanwhile, the main concern is presence or absence of base warranty and strategies adopted by the manufacturer during this period. Moreover, extended warranty structure must be responsive and customer oriented, which not only control the services cost but ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 31  شماره 

صفحات  -

تاریخ انتشار 2004