Single-machine scheduling with waiting-time-dependent due dates

نویسندگان

  • Christos Koulamas
  • George J. Kyparisis
چکیده

We consider a single-machine scheduling problem in which due dates are linear functions of the job waiting-times and the objective is to minimize the maximum lateness. An optimal sequence is constructed by implementing an index-based priority rule for a fixed value of the due date normalizing constant k. We determine in polynomial time all the k value ranges so that the optimal sequence remains the same within each range. The optimal due dates are computed as linear functions of the global optimal value of k. The overall procedure is illustrated in a numerical example. 2007 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

A Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem

This paper employs an interactive possibility linear programming approach to solve a single machine scheduling problem with imprecise processing times, due dates, as well as earliness and tardiness penalties of jobs. The proposed approach is based on a strategy of minimizing the most possible value of the imprecise total costs, maximizing the possibility of obtaining a lower total costs, and mi...

متن کامل

An approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine

This paper addresses the Tardy/Lost penalty minimization with common due dates on a single machine. According to this performance measure, if the tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. Initially, we present a 2-approximation algorithm and examine its worst case ratio bound. Then, a pseudo-polynomial dynamic programming algorithm is de...

متن کامل

Minimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem

  This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...

متن کامل

Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability

In this paper, an integrated machine scheduling withits due date setting problem has been considered. It is assumed that the machine is subject to some kind of random unavailability. Due dates should be set in an attractive and reliable manner, implying that they should be short and possible to be met. To this end, first, long due dates are penalized in the objective function. Then, for each cu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 191  شماره 

صفحات  -

تاریخ انتشار 2008