‘Managing’ Non-linear Projects

نویسندگان

  • Sue Newell
  • Maxine Robertson
  • Jacky Swan Warwick
چکیده

It is increasingly recognized that innovation processes, especially in relation to the development of technologies that are radical or disruptive, do not follow the often-assumed linear progress – from basic science to applied research through development to commercialization. Instead, these kinds of innovation processes are better characterized as ‘interactive’ or ‘networked’ (Rothwell, 1994; Coombs et al, 2003). This recognizes that the locus of innovation resides in ‘the network of inter-organizational relationships that sustain a fluid and evolving community’ (Powell et al. 1996). Moreover, the notion of interactivity also recognizes that the temporal features of innovation cannot be predicted in advance because how the knowledge evolves is inherently indeterminate and political (Tsoukas, 1996, Swan and Scarbrough, 2005). Assumptions of space and time are, therefore, radically different in relation to interactive (as opposed to linear) innovation processes.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

KNOWLEDGE MANAGEMENT TO INVESTIGATE THE FAILURE FACTORS IN MANAGING OF GAS AND OIL INDUSTRY TRANSMISSION LINES PROJECTS

In this study the challenges of managing the civil projects in oil and gas industry over recent years that failed were investigated. For this purpose, the relevant cases and their effectiveness were categorized by analyzing research data obtained from the questionnaire results. The results obtained from the research showed that there is a positive and significant relationship between the projec...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

Non-Wire Alternatives to Capacity Expansion

Distributed energy resources (DERs) can serve as non-wire alternatives to capacity expansion by managing peak load to avoid or defer traditional expansion projects. In this paper, we study a planning problem that co-optimizes DERs investment and operation (e.g., energy efficiency, energy storage, demand response, solar photovoltaic) and the timing of capacity expansion. We formulate the problem...

متن کامل

E-Collaboration in Modern Organizations: Initiating and Managing Distributed Projects

E-Collaboration in Modern Organizations: Initiating and Managing Distributed Projects combines comprehensive research related to e-collaboration in modern organizations, emphasizing topics relevant to those involved in initiating and managing distributed projects. Providing authoritative content to scholars, researchers, and practitioners, this book specifically describes conceptual and theoret...

متن کامل

Temporality in Organization Studies: Implications for Strategic Project Management

Project managers require temporal skills and the ability to improvise when linear assumptions confront the complexities of managing projects within a context of strategic calculation. While the management and organization (MOS) literature emphasizes the importance of temporal skills for managing uncertainty, ambiguity and complexity, a dearth of project management literature contributes to this...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010