Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times

نویسندگان

  • Vahid Kayvanfar
  • G. M. Komaki
  • Amin Aalaei
  • Mostafa Zandieh
چکیده

Job scheduling has always been a challenging task in modern manufacturing and the most real life scheduling problems which involves multi-criteria and multi-machine environments. In this research our direction is largely motivated by the adoption of the Just-In-Time (JIT) philosophy in parallel machines system, where processing times of jobs are controllable. The goal of this paper is to minimize total weighted tardiness and earliness besides jobs compressing and expanding costs, depending on the amount of compression/expansion as well as maximum completion time called makespan simultaneously. Jobs due dates are distinct and no inserted idle time is allowed after starting machine processing. Also each machine is capable of processing only some predetermined jobs and operations with probably different speeds. A Mixed Integer Programming (MIP) model is proposed to formulate such a problem and is solved optimally in small size instances. A Parallel Net Benefit Compression-Net Benefit Expansion (PNBC–NBE) heuristic is then presented to acquire the optimal jobs set amount of compression and expansion processing times in a given sequence. To solve medium-to-large size cases, a proposed heuristic, two meta-heuristics and a hybrid technique are also employed. Experimental results demonstrate that our hybrid procedure is a proficient method and could efficiently solve such complicated problems. & 2013 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

متن کامل

Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs

Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...

متن کامل

Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs

Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...

متن کامل

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 41  شماره 

صفحات  -

تاریخ انتشار 2014