Order Scheduling Models: Hardness and Algorithms

نویسندگان

  • Naveen Garg
  • Amit Kumar
  • Vinayaka Pandit
چکیده

We consider scheduling problems in which a job consists of components of different types to be processed on m machines. Each machine is capable of processing components of a single type. Different components of a job are independent and can be processed in parallel on different machines. A job is considered as completed only when all its components have been completed. We study both completion time and flowtime aspects of such problems. We show both lowerbounds and upperbounds for the completion time problem. We first show that even the unweighted completion time with single release date is MAX-SNP hard. We give an approximation algorithm based on linear programming which has an approximation ratio of 3 for weighted completion time with multiple release dates. We give online algorithms for the weighted completion time which are constant factor competitive. For the flowtime, we give only lowerbounds in both the offline and online settings. We show that it is NP-hard to approximate flowtime within Ω(logm) in the offline setting. We show that no online algorithm for the flowtime can have a competitive ratio better than Ω( √ m).

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy Multi-objective Permutation Flow Shop Scheduling Problem with Fuzzy Processing Times under Learning and Aging Effects

In industries machine maintenance is used in order to avoid untimely machine fails as well as to improve production effectiveness. This research regards a permutation flow shop scheduling problem with aging and learning effects considering maintenance process. In this study, it is assumed that each machine may be subject to at most one maintenance activity during the planning horizon. The objec...

متن کامل

MULTI-OBJECTIVE ROUTING AND SCHEDULING IN FLEXIBLE MANUFACTURING SYSTEMS UNDER UNCERTAINTY

The efficiency of transportation system management plays an important role in the planning and operation efficiency of flexible manufacturing systems. Automated Guided Vehicles (AGV) are part of diversified and advanced techniques in the field of material transportation which have many applications today and act as an intermediary between operating and storage equipment and are routed and contr...

متن کامل

No-idle time Scheduling of Open shops: Modeling and Meta-heuristic Solution Methods

In some industries as foundries, it is not technically feasible to interrupt a processor between jobs. This restriction gives rise to a scheduling problem called no-idle scheduling. This paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. The problem is first mathematically formulated by three different mixed integer linear programming...

متن کامل

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint

Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...

متن کامل

Optimization of a Bi-objective Scheduling for Two Groups of Experienced and Inexperienced Distribution Staff Based on Capillary Marketing

Developing an appropriate plan for distribution department is significant because of its influence on company's other costs and customers' satisfaction. In this study, a new bi-objective mix-integer linear programming model developed for scheduling two groups of experienced and inexperienced distribution staff based on capillary marketingin Pak Pasteurized Dairy Products Company of Guilan provi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007